FIR07-00637
| INSP-Final Inspection | 1/14/2008 | 1/15/2008 | 1/15/2008 6:00:23 PM | P | FAIL |
|
|
Forward flush passed. To final the project the 1 1/4" branchline needs to be relocated around the electrical room.
|
FIR08-00026
| INSP-Sprinkler Rough-in | 1/15/2008 | 1/15/2008 | 1/15/2008 4:37:04 PM | P | PASS |
|
|
The 5' stub out is ok to cover.
|
FIR07-00686
| INSP-Alarm Testing | 1/14/2008 | 1/15/2008 | 1/15/2008 4:36:13 PM | A | DONE |
|
|
See the city approved plans for items tested and deficiencies noted.
|
FIR07-01024
| INSP-Sprinkler Rough-in | 1/14/2008 | 1/15/2008 | 1/15/2008 2:26:24 PM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|
BLD08-00046
| FIRE-Final Inspection | 1/11/2008 | 1/15/2008 | 1/15/2008 2:25:31 PM | A | FAIL |
|
|
Tag the fire extinguishers, provide hardware on the required exit doors, cover the "exit" text on the doors that are not going to be used for exits and repair the trouble signals on the fire alarm panel. Also repair the fire dept access signs at the property entrances.
|
BLD07-02601
| FIRE-Final Inspection | 1/14/2008 | 1/15/2008 | 1/15/2008 2:23:24 PM | A | FAIL |
|
|
Repair the main exit doors, remove the u hooks from the rear door and provide the occupant load sign for 105 people.
|