ESC08-00968
| Tracking Control | 1/15/2009 | 1/15/2009 | 1/15/2009 4:00:22 PM | P | FAIL |
|
|
24hr verbal correction to RP: 1.Clean up all tracking from alley way due to construction traffic. Also contact ACHD on the muddy alley way 2. Clean all sediment and debris off of the street area. Will re-inspect on 1/16/09 PM
|
ESC08-00575
| General Inspection ESC | 1/15/2009 | 1/15/2009 | 1/15/2009 3:25:08 PM | | FAIL |
|
|
Left a message for the RP at the number given. Clean up all sediment and debris off of all hard surfaces trough out the whole subdivision. Will re-inpsect on 1/21/09
|
ESC08-00821
| General Inspection | 1/15/2009 | 1/15/2009 | 1/15/2009 3:01:13 PM | P | PASS |
|
|
|
ESC08-01023
| Site Preparation ESC | 1/15/2009 | 1/15/2009 | 1/15/2009 11:23:23 AM | | FAIL |
|
|
Verbal to RP: 1. Post the correct ESC sing at the entrance of project area. 2. Stabilize or block off the access point at the west end. Will re-inspect on 1/21/09.
|
ESC07-01595
| Tracking Control | 1/12/2009 | 1/15/2009 | 1/15/2009 10:24:21 AM | A | PASS |
|
|
All issues dealt with from the prior inspection.
|
ESC08-00725
| BMP Violation | 1/12/2009 | 1/15/2009 | 1/15/2009 10:19:32 AM | A | PART |
|
|
Verbal to RP: the way that the wattle is staked inplace, you use a twine to keep it sitting down into the trach. Or re-stake it through the center of the wattle. Also clean up all sediment off of the hard surfaces on a daily basis. Will re-inspect on 1/21/09AM.
|
ESC08-01017
| Site Preparation | 1/15/2009 | 1/15/2009 | 1/15/2009 9:59:52 AM | | PART |
|
|
Left message with RP: Concrete washout not provided at this time. Must provide a washout pit (external or pit) prior to concrete pour. Will re-inspect on 1/20/09.
|