BLD09-01578
| FIRE-Final Inspection | 1/14/2010 | 1/15/2010 | 1/15/2010 5:53:07 PM | P | FAIL |
|
|
Provide approved hardware at the north exit as discussed per IFC 2006 ch. 10. Exit signs and EM lights tested okay.
|
BLD09-02210
| FIRE-Final Inspection | 1/15/2010 | 1/15/2010 | 1/15/2010 5:50:34 PM | P | PASS |
|
|
Fire life safety is acceptable, inspection passed.
|
BLD09-02196
| FIRE-Final Inspection | 1/15/2010 | 1/15/2010 | 1/15/2010 5:49:44 PM | P | PASS |
|
|
Life safety inspection passed.
|
FIR10-00017
| INSP-Final Inspection | 1/15/2010 | 1/15/2010 | 1/15/2010 5:49:05 PM | P | PASS |
|
|
Scope of fire alarm work passed field testing, permit finaled.
|
BLD09-01820
| FIRE-Sprinkler Rough-in | 1/15/2010 | 1/15/2010 | 1/15/2010 5:48:18 PM | A | PART |
|
|
Fire sprinkler rough-in okayed for cover at the drop ceilings in the remodel area.
|
BLD09-00887
| FIRE-Conference | 1/15/2010 | 1/15/2010 | 1/15/2010 5:47:03 PM | A | DONE |
|
|
Conference with general contractor regarding NFPA 13 2007 sec. 8.15.1.2.-8.15.2.2.
|
FIR09-00612
| INSP-Final Inspection | 1/14/2010 | 1/15/2010 | 1/15/2010 5:44:36 PM | A | PART |
|
|
Remainder of overhead rough-in okayed for cover at both basement and first floor levels.
|