ESC09-00352
| General Inspection | 1/15/2010 | 1/15/2010 | 1/15/2010 3:27:36 PM | P | PART |
|
|
Inspect berms along Boise River: Berms are being constructed (cells to reduce the river flows in the future). Adding top soil, plugs and vegetation is still needed.
|
ESC09-00286
| General Inspection | 1/15/2010 | 1/15/2010 | 1/15/2010 3:10:37 PM | P | PART |
|
|
Stormwater ponds still need to be stabilized, Wetlands LLC remains the contractor who will stabilized, elevation of pond water needs to be drawed down to allow for plantings.
|
ESC10-00010
| Conference | 1/15/2010 | 1/15/2010 | 1/15/2010 3:08:48 PM | P | DONE |
|
|
1:30 Pre-Construction Meeting: Met with Harris Ranch Rep, D. Powell, Contractor, Jeff & Randy and 3rd party consultant, P. Jones. Reviewed ESC including permit conditions, stabilization requirements, dewatering (only pre-development flow rates are allowed into Walling Creek) and water must meet water quality standards, transfering permits to another party and the upcoming Jan. 29th ESC workshop.
|