Inspections for the day of: Friday, January 15, 2010.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00352 General Inspection1/15/20101/15/20101/15/2010 3:27:36 PMPPART
Inspect berms along Boise River: Berms are being constructed (cells to reduce the river flows in the future). Adding top soil, plugs and vegetation is still needed.
ESC09-00286 General Inspection1/15/20101/15/20101/15/2010 3:10:37 PMPPART
Stormwater ponds still need to be stabilized, Wetlands LLC remains the contractor who will stabilized, elevation of pond water needs to be drawed down to allow for plantings.
ESC10-00010 Conference1/15/20101/15/20101/15/2010 3:08:48 PMPDONE
1:30 Pre-Construction Meeting: Met with Harris Ranch Rep, D. Powell, Contractor, Jeff & Randy and 3rd party consultant, P. Jones. Reviewed ESC including permit conditions, stabilization requirements, dewatering (only pre-development flow rates are allowed into Walling Creek) and water must meet water quality standards, transfering permits to another party and the upcoming Jan. 29th ESC workshop.