Inspections for the day of: Friday, January 15, 2010.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01035 FIRE-Final Inspection1/15/20101/15/20101/15/2010 3:50:06 PMPFAIL
This project was not ready for a final inspection so we performed a conference. A duct smoke detector will be required on RTU 4 along with the remote annunciator. Three doors need the correct single action hardware installed. Exit signs and emergency lights tested ok. The hood suppression system needs to be installed and tested as well as fire extinguishers installed.
FIR09-00320 INSP-Final Inspection1/15/20101/15/20101/15/2010 3:01:59 PMPFAIL
Could not get access to the fire alarm panel due to the room being locked. WIll have to reschedule.
BLD09-00945 FIRE-Conference1/15/20101/15/20101/15/2010 2:07:38 PMPDONE
Per HC Company's request I spoke to Scott and he agreed that we would allow the remodeled/expanded main Lobby/Waiting area to be occupied Tuesday morning, 1/18/10, as long as the sprinklers, alarms (pending resubmittal) and life safety were complete. Darren with HC agreed and will be setting up an inspection for tuesday morning to verify items with Troy Cobbley.
FIR09-00611 INSP-Sprinkler Rough-in1/14/20101/15/20101/15/2010 2:04:12 PMAPART
Todays inspection was a partial for Area #6. See the city approved plans for this location clouded in red. Piping can be covered except for the two pendant heads that need to be added due to overspacing. These have been clouded as well.
FIR09-00708 INSP-Sprinkler Rough-in1/14/20101/15/20101/15/2010 2:01:31 PMAPART
Todays inspection was for the dry system #3. The rough-in is passed in general. The problems needing corrected include restraints are missing on the three branchlines over the kitchen area, through bolts are required for all of the earthquake connections to the wood members, the laterals and longitudinals can not be connected together unless calc'ed that way and 3/4" through bolts are required not the 3/8" as installed.
FIR09-00703 INSP-Final Inspection1/14/20101/15/20101/15/2010 11:11:42 AMAFAIL
Inspection was to verify that the flex heads had been clipped onto the t-bar. Can't give the final until the ceiling tile has been covered.
BLD09-02162 FIRE-Final Inspection1/13/20101/15/20101/15/2010 11:07:00 AMAFAIL
All items except the emergency lights and exit signs have been corrected.