Inspections for the day of: Friday, January 15, 2010.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00012 Site Preparation1/15/20101/15/20101/15/2010 4:11:55 PM NR
ESC09-00785 General Inspection1/14/20101/15/20101/15/2010 2:55:33 PMPPART
Message to GC:
Could not reach RP. Left a message with the GC for a confrence with the RP and the GC to go over the requiremenst that follow with the RP of the project. Will re-inspect on 1/19/10 AM
ESC08-00924 Site Preparation10/26/20091/15/20101/15/2010 2:48:28 PMAPART
Message to Boise City Public Works (Mike Shepard):
When is the tentitive date for seeding on the North west area of project and what activies occured on the area? Waiting on contact from Public Works. Will follow up on 3/15/10am
ESC10-00010 Conference1/15/20101/15/20101/15/2010 2:45:09 PMPDONE
refer to #420 notes.
ESC09-00046 BMP Violation1/13/20101/15/20101/15/2010 11:09:19 AMAPASS
ESC09-00779 Site Preparation1/15/20101/15/20101/15/2010 10:59:26 AM NR
Will re-inspect on 2/15/10
ESC09-00741 Tracking Control1/14/20101/15/20101/15/2010 10:26:34 AMAPART
Need to clean up foot traffic tracking off of hard surface on a daily basis.
ESC09-00741 Site Preparation1/15/20101/15/20101/15/2010 10:25:49 AM CANC
ESC09-00746 Site Preparation1/15/20101/15/20101/15/2010 10:11:10 AM NR
Will re-inspect on 2/16/10 am