BLD12-02798
| BLD-Final | 1/8/2013 | 1/9/2013 | | A | |
|
|
chuck Phone #: ###-####
|
MIS13-00007
| BLD-Conference | 1/15/2013 | 1/15/2013 | 1/16/2013 7:22:00 AM | P | DONE |
|
|
PLease call prior to inspection--Scott is the realtor or Rhiannon is with HCDC Phone #: ###-#### Corrections....GFCIs Smoke and CO2 Det. Temp glass or bar 2 large windows Egress windows 2 bedrms.
|
GCB11-00074
| GCB-Final | 1/11/2013 | 1/15/2013 | 1/15/2013 12:12:50 PM | A | PASS |
|
|
Daniel ###-#### Call in advance Unable to determine if all other permits related to this project have been finaled. Structural final only....OK.
|
BLD11-01939
| BLD-Final | 1/14/2013 | 1/15/2013 | 1/15/2013 11:39:46 AM | A | PASS |
|
|
mary ann Phone #: ###-#### OK fpr Perm Occ.
|
BLD12-02890
| BLD-Framing/Rough-in | 1/14/2013 | 1/15/2013 | 1/15/2013 10:58:59 AM | A | PART |
|
|
Matt Phone #: ###-#### Should have been Energy code......OK.
|
BLD10-02541
| BLD-Final | 1/14/2013 | 1/15/2013 | 1/15/2013 10:57:42 AM | A | FAIL |
|
|
Eric ###-#### Called Eric...He said Zoning came out and failed it. some one (un-related to this job) put some stripes on the lot in the wrong place or something.
|