PLM13-03349
| Water and/or Sewer | 1/15/2014 | 1/15/2014 | 1/15/2014 4:46:57 PM | P | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Brent Lacy one inch water line on east side of building test ok
|
PLM13-02223
| PLM-Aging Inspection | 1/15/2014 | 1/15/2014 | 1/15/2014 4:23:40 PM | | PASS |
|
|
no call for final
|
PLM14-00075
| Water and/or Sewer | 1/14/2014 | 1/15/2014 | 1/15/2014 4:22:13 PM | A | PART |
|
|
Mile will give you a call when ready for inspection. Phone #: ###-#### >> Inspection requested via web by James Staley first 100 ft of sewer and water ok ok to cover contractor to recall when ready for second phase
|
PLM13-02578
| Final | 1/14/2014 | 1/15/2014 | 1/15/2014 3:55:31 PM | A | PART |
|
|
I will be there Phone #: ###-#### >> Inspection requested via web by Mike Blessing made walk through with plumbing contractor need to make walk through with Bill T. with united water on cross control connection
|
PLM14-00049
| Water Heater Final | 1/15/2014 | 1/15/2014 | 1/15/2014 3:26:14 PM | P | PASS |
|
|
This is for #31. Any questions please contact Justin. Thank you! Phone #: ###-#### >> Inspection requested via web by Ben Davis
|
PLM13-02402
| Final | 1/15/2014 | 1/15/2014 | 1/15/2014 3:00:49 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Hurren
|
PLM14-00108
| Plumbing Rough-in | 1/15/2014 | 1/15/2014 | 1/15/2014 2:35:48 PM | P | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Derek Williams test failed on D W V and water need to retest correction notice on site contractor to recall when ready
|
PLM13-02970
| Final | 1/15/2014 | 1/15/2014 | 1/15/2014 2:02:44 PM | P | PART |
|
|
PARTIAL Final. if questions call Kevin @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann final on sink in area phase 1-A ok jej
|
PLM13-03426
| Final | 1/15/2014 | 1/15/2014 | 1/15/2014 11:17:15 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Travis Baker
|
PLM14-00101
| Water and/or Sewer | 1/14/2014 | 1/15/2014 | 1/15/2014 10:57:00 AM | A | NR |
|
|
water line Phone #: ###-#### >> Inspection requested via web by Ashleigh Meligan no water line installed at this time called contractor will recall when ready
|
PLM14-00102
| Water and/or Sewer | 1/14/2014 | 1/15/2014 | 1/15/2014 10:54:49 AM | A | FAIL |
|
|
water line Phone #: ###-#### >> Inspection requested via web by Ashleigh Meligan only one water line at this time test failed on water also need blue tracer installed called contractor will recall when ready
|
PLM14-00038
| Plumbing Rough-in | 1/14/2014 | 1/15/2014 | 1/15/2014 9:41:54 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Erin Whiting test failed on D W V and water system need to retest need to be one foot away from vertical surface for vent termination as per I S P C upc 2009 906.1 on kit sink vent and two inch vent on south-east side of building correction notice on site contractor to recall when ready
|
PLM13-03370
| Plumbing Rough-in | 1/14/2014 | 1/15/2014 | 1/15/2014 9:13:41 AM | A | PASS |
|
|
cory RI = swr & water Phone #: ###-#### water and D W V test ok
|
PLM13-03370
| Med/Gas Systems | 1/14/2014 | 1/15/2014 | 1/15/2014 9:12:32 AM | A | PART |
|
|
cory Phone #: ###-#### start of 24 hr pressure test
|