GCB14-00122
| GCB-Final | 1/15/2015 | 1/15/2015 | 1/16/2015 12:09:20 PM | A | DONE |
|
|
INSPECTOR (J. SLY) RESCHEDULED INSPECTION WITH CONTRACTOR DIRECTLY - NO RESCHEDULE RECEIVED BY GC OFFICE
|
BLD14-03350
| BLD-Framing/Rough-in | 1/14/2015 | 1/15/2015 | 1/16/2015 4:57:18 AM | P | PEND |
|
|
Colby Phone #: ###-####ok to insulate after plumbing rough in is signed off
|
BLD13-01634
| BLD-Framing/Rough-in | 1/14/2015 | 1/15/2015 | 1/15/2015 12:38:56 PM | A | PASS |
|
|
requesting sheathing inspection for level 5 soffits by pioneer stair and level 4 soffit by passenger elevator Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD13-03418
| BLD-Framing/Rough-in | 1/14/2015 | 1/15/2015 | 1/15/2015 10:25:03 AM | A | PART |
|
|
Bruce Phone #: ###-#### kitchen area by front door ok after elec oks
|
BLD13-03418
| BLD-Conference | 1/14/2015 | 1/15/2015 | 1/15/2015 10:24:06 AM | A | DONE |
|
|
Bruce Phone #: ###-####
|
BLD14-03289
| BLD-Final | 1/14/2015 | 1/15/2015 | 1/15/2015 9:31:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by rick valdez
|
MIS15-00008
| BLD-Final | 1/14/2015 | 1/15/2015 | | A | |
|
|
|