BLD14-01901
| FIRE-Final Inspection | 1/15/2015 | 1/15/2015 | 1/15/2015 3:31:15 PM | P | FAIL |
|
|
Need project related fire alarm permit finaled FIR14-00709
|
BLD15-00108
| FIRE-Final Inspection | 1/15/2015 | 1/15/2015 | 1/15/2015 2:49:06 PM | P | PASS |
|
|
life safety passed
|
BLD14-00226
| FIRE-Final Inspection | 1/15/2015 | 1/15/2015 | 1/15/2015 2:48:46 PM | P | PASS |
|
|
life safety passed
|
BLD14-00209
| FIRE-Final Inspection | 1/15/2015 | 1/15/2015 | 1/15/2015 10:39:06 AM | A | PASS |
|
|
Life safety passed. Contractor to have suite numbers installed prior to a building inspection.
|
BLD14-03150
| FIRE-Final Inspection | 1/14/2015 | 1/15/2015 | 1/15/2015 10:37:52 AM | A | FAIL |
|
|
Remove thumbturn deadbolts from three exits, keyed ok at the main exit, provide single action hardware for all doors per approved plans.
|
FIR14-00596
| INSP-Final Inspection | 1/14/2015 | 1/15/2015 | 1/15/2015 10:36:59 AM | A | PASS |
|
|
Permit finaled
|
FIR14-00745
| INSP-Sprinkler Rough-in | 1/14/2015 | 1/15/2015 | 1/15/2015 10:36:37 AM | A | PASS |
|
|
Piping in office area can be covered. 6" main installed and passed. Heads under doors installed and passed
|
FIR14-00573
| INSP-Sprinkler Rough-in | 1/14/2015 | 1/15/2015 | 1/15/2015 9:53:48 AM | A | PASS |
|
|
Tenting passed. Piping can be covered
|