ELE15-00102
| Electrical Rough-In | 1/15/2015 | 1/15/2015 | 1/15/2015 5:35:45 PM | A | PASS |
|
|
Chris is contact. Talk to Daryl DeGrange before inspecting.
Thank you Phone #: ###-#### Inspection requested via web by Chris Chesnut rough-in ok cover entry and bathroom areas
|
ELE14-01812
| Electrical Rough-In | 1/14/2015 | 1/15/2015 | 1/15/2015 5:33:22 PM | P | PASS |
|
|
Rough-in hard lid inspection for IL area ''B'' 3rd floor rooms:B351, B352, B353, B355, B356, B357 and ''B'' 4th floor rooms:B451, B452, B453, B455, B456, ; B457. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum rough-in ok cover as per listed
|
MIS15-00008
| ELE-Final | 1/14/2015 | 1/15/2015 | 1/15/2015 9:52:00 AM | A | PASS |
|
|
Trades have obtained approriate permits
|