ESC15-01283
| General Inspection | 1/15/2016 | 1/15/2016 | 1/19/2016 3:35:27 PM | P | PEND |
|
|
No violations at site. Limited activity. Foundation has been poured. Assessed fees for previous violations have not yet been paid.
|
ESC15-00107
| DOC - Permit Finaled | 1/15/2016 | 1/15/2016 | 1/15/2016 3:55:55 PM | P | PASS |
|
|
Historic home is removed and site now cleared for new project (The Roost/Fowler), see ESC15-00762. ESC permit conditions met.
|
ESC15-00104
| DOC - Permit Finaled | 1/15/2016 | 1/15/2016 | 1/15/2016 3:55:33 PM | P | PASS |
|
|
Historic home is removed and site now cleared for new project (The Roost/Fowler), see ESC15-00762. ESC permit conditions met.
|
ESC15-00103
| DOC - Permit Finaled | 1/15/2016 | 1/15/2016 | 1/15/2016 3:55:12 PM | P | PASS |
|
|
Historic home is removed and site now cleared for new project (The Roost/Fowler), see ESC15-00762. ESC permit conditions met.
|
ESC15-00762
| Site Preparation | 1/14/2016 | 1/15/2016 | 1/15/2016 3:44:01 PM | A | PEND |
|
|
Spoke with RP for project. Onsite ESC/SWPPP meeting will be scheduled for next week.
|
ESC14-00983
| General Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 3:04:56 PM | | PART |
|
|
No activity. No permit sign.
Need to post sign and install BMPs to prepare for further construction (construction entrance)
|
ESC15-00623
| General Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 2:59:12 PM | | CANC |
|
|
rescheduled
|
ESC14-01040
| General Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 2:47:33 PM | | PART |
|
|
Construction complete at Breckenwood and open areas have been stabilized. No trackout or discharges.
Need to remove sediment bag on Shelly MS4 and remove DI bags within complex or have owners agree to maintain them.
|
ESC15-00504
| Random Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 2:45:26 PM | P | PASS |
|
|
Streets recentlly swept, no trackout or dischareges observed at Kensington. DI bags installed on Saxton and Gary Lane.
|
ESC15-00935
| Aging Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 2:32:20 PM | | PASS |
|
|
Home complete and occupied. Homeowner to complete landscaping. No sediment leaving site, and dirt is graded below curb levels.Active construction on Steve Ct. in progress. ESC permit finaled.
|
ESC15-00935
| DOC - Permit Finaled | 1/15/2016 | 1/15/2016 | 1/15/2016 2:31:04 PM | P | PASS |
|
|
|
ESC14-01052
| General Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 2:07:39 PM | | PART |
|
|
No trackout or discharges to Maple Grove or to the MS4. Several units at the front of Ashville Commons are complete and sod has been laid. Several apartments are occupied.
SWPPP sign and box are still posted, though there are no recent site inspections, possibly due to vertical construction only?
Lots of trash, boxes, building materials along South Slough. Even some ventilation tubing in ditch itself. Shows lack of housekeeping and inadequate waste management.
At the east end of parking/access area there is a lot of mud and other debris. The permeable pavement has mud and sediment all over it which will prevent proper drainaige.
Corrections to pick up trash and protect/clean newly installed stormwater infrastructure to Biltmore RP.
|
ESC15-01347
| BMP Violation | 1/12/2016 | 1/15/2016 | 1/15/2016 1:28:46 PM | A | CANC |
|
|
Follow up on CN issued Tuesday 1/12
Compliance date extended due to recent snow/rainfall received
|
ESC14-00059
| DOC - Permit Finaled | 1/15/2016 | 1/15/2016 | 1/15/2016 12:36:48 PM | P | PASS |
|
|
|
ESC14-00059
| General Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 12:36:21 PM | | FAIL |
|
|
Need to change out DI bag that is receiving dirty sheet flow from the new phase of Cordillera. Need to sweep parking lots when conditions dry.
No active construction in this phase, no further inspections on this permit. See ESC15-00336 for active corrections. Same RP. This permit finaled.
|
ESC15-01091
| BMP Violation | 1/13/2016 | 1/15/2016 | 1/15/2016 9:35:31 AM | P | PEND |
|
|
RP acknowledged correction requests issued and has started clean up process. Overnight snowfalls have delayed some operations since Wednesday. Will re-inspect early next week to check conditions after the foundation has been backfilled. Wattles will be reinstalled.
|
ESC15-00643
| General Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 9:10:27 AM | | PASS |
|
|
Project complete. ESC conditions satisfied.
|
ESC15-00643