Inspections for the day of: Tuesday, January 16, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE00-01971 Electrical Rough-In1/12/20011/16/20011/16/2001 12:00:00 AMAPART
r/i-- ###-#### kelly. basement, 1st floor stairtower r/i, 4th floor exterior soffit lighting r/i. 1/16/2001 10:07:57 AM
ELE01-00145 Electrical Rough-In1/12/20011/16/20011/16/2001 12:00:00 AMAFAIL
Renata ###-####. not completed, will reschedule. 1/16/2001 10:34:53 AM
ELE01-00137 Electrical Rough-In1/12/20011/16/20011/16/2001 12:00:00 AMAPASS
###-####. stairwell; 1st, 2nd, & 3rd level ele r/i. 1/16/2001 9:38:04 AM
ELE00-04637 Final1/16/20011/16/20011/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/16/2001 at 07:21:09. Contact: ###-####. completed. 1/16/2001 10:50:00 AM
ELE01-00071 Electrical Rough-In1/16/20011/16/20011/16/2001 12:00:00 AMPPASS
Mark ###-####. stairwell; 1st, 2nd, &3rd floors. 1/16/2001 1:40:10 PM
ELE00-04361 Final1/16/20011/16/20011/16/2001 12:00:00 AMPPASS
RICHARD CELL ###-#### FN. completed. 1/16/2001 2:45:06 PM
ELE00-03804 Final1/16/20011/16/20011/16/2001 12:00:00 AMPFAIL
Steve ###-#### there are keys up above the front door on both units... not completed, called contractor, left message to reschedule. 1/16/2001 2:08:44 PM
ELE01-00145 Electrical Rough-In1/16/20011/16/20011/16/2001 12:00:00 AMPPART
Added by Inspector: 403 On 1/16/2001 2:48:26 PM code requirements for addition.
ELE01-00066 Electrical Rough-In1/12/20011/16/20011/16/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/12/2001 at 13:16:59. Contact: ###-####. relocated recepticle outlets, and switchhes on extended bathroom walls, 3rd floor. 1/16/2001 3:53:51 PM