ELE00-01971
| Electrical Rough-In | 1/12/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | A | PART |
|
|
r/i-- ###-#### kelly. basement, 1st floor stairtower r/i, 4th floor exterior soffit lighting r/i. 1/16/2001 10:07:57 AM
|
ELE01-00145
| Electrical Rough-In | 1/12/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | A | FAIL |
|
|
Renata ###-####. not completed, will reschedule. 1/16/2001 10:34:53 AM
|
ELE01-00137
| Electrical Rough-In | 1/12/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | A | PASS |
|
|
###-####. stairwell; 1st, 2nd, & 3rd level ele r/i. 1/16/2001 9:38:04 AM
|
ELE00-04637
| Final | 1/16/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 07:21:09. Contact: ###-####. completed. 1/16/2001 10:50:00 AM
|
ELE01-00071
| Electrical Rough-In | 1/16/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | P | PASS |
|
|
Mark ###-####. stairwell; 1st, 2nd, &3rd floors. 1/16/2001 1:40:10 PM
|
ELE00-04361
| Final | 1/16/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | P | PASS |
|
|
RICHARD CELL ###-#### FN. completed. 1/16/2001 2:45:06 PM
|
ELE00-03804
| Final | 1/16/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | P | FAIL |
|
|
Steve ###-#### there are keys up above the front door on both units... not completed, called contractor, left message to reschedule. 1/16/2001 2:08:44 PM
|
ELE01-00145
| Electrical Rough-In | 1/16/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 403 On 1/16/2001 2:48:26 PM code requirements for addition.
|
ELE01-00066
| Electrical Rough-In | 1/12/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 13:16:59. Contact: ###-####. relocated recepticle outlets, and switchhes on extended bathroom walls, 3rd floor. 1/16/2001 3:53:51 PM
|