BLD99-02619
| FIRE-Final Inspection | 1/12/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 11:41:35. Contact: ###-####.
|
BLD00-00758
| FIRE-Final Inspection | 1/15/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 16:13:06. Contact: ###-####. temp approved for 2nd floor use. exiting okay - deadbolt from rear removed 1/16/2001 3:36:52 PM
|
BLD00-03556
| FIRE-Final Inspection | 1/16/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | P | PASS |
|
|
FIRE LIFE SAFTY\\###-#### deadbolts aren't releasing with lever on east and data room doors will be fixed for structual inspector 1/16/2001 3:48:50 PM
|
BLD00-03202
| FIRE-Final Inspection | 1/16/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 409 On 1/16/2001 2:25:46 PM
|
FIR00-00694
| INSP-Final Inspection | 1/15/2001 | 1/16/2001 | 1/16/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 07:45:35. Contact: ###-####.
|