Inspections for the day of: Tuesday, January 16, 2001.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-04393 Rough-in1/12/20011/16/20011/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/12/2001 at 09:39:26. Contact: ###-####.
MEC00-03901 Final1/12/20011/16/20011/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/12/2001 at 12:02:46. Contact: ###-####.
MEC00-03976 Final1/12/20011/16/20011/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/12/2001 at 12:03:50. Contact: ###-####.
BLD00-03105 BLD-Framing/Rough-in1/12/20011/16/20011/16/2001 12:00:00 AMAPART
please call ###-#### before you go out so that someone can open: Not ready to cover, needs to request conferance with inspector to discuss. 1/16/2001 9:32:40 AM
BLD00-03293 BLD-Energy code compliance1/15/20011/16/20011/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/15/2001 at 11:59:17. Contact: ###-####.
BLD00-03199 BLD-Framing/Rough-in1/16/20011/16/20011/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/16/2001 at 06:53:23. Contact: ###-####. Shear--ok to side. 1/16/2001 11:47:37 AM
BLD00-03532 BLD-Framing/Rough-in1/16/20011/16/20011/16/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/16/2001 at 06:54:36. Contact: ###-####.ok to side 1/16/2001 10:57:58 AM
MEC00-03869 Final1/16/20011/16/20011/16/2001 12:00:00 AMAFAIL
Scheduled by Inspector: 420 On 1/16/2001 11:50:19 AM Pipe barricade needed in front of mechanical unit. 1/16/2001 12:07:53 PM
MEC01-00176 Rough-in1/16/20011/16/20011/16/2001 12:00:00 AMAPASS
MEC01-00176 Pressure Test1/16/20011/16/20011/16/2001 12:00:00 AMAPASS
BLD00-02637 BLD-Final1/16/20011/16/20011/16/2001 12:00:00 AMPCANC
Scheduled by Inspector: 420 On 1/16/2001 12:36:44 PM Cancelled by contractor, electrical final not completed. 1/16/2001 1:34:57 PM
MEC00-04222 Final1/10/20011/16/20011/16/2001 12:00:00 AMPCANC
###-#### FURN: Transfered to inspector #415 1/16/2001 1:33:35 PM
MEC00-03908 Final1/16/20011/16/20011/16/2001 12:00:00 AMPPASS
fn--didn't want to leave # Contractor called inspector and requested am inspection. 1/16/2001 10:03:31 AM
MEC00-02754 Final1/16/20011/16/20011/16/2001 12:00:00 AMPPASS
###-####
MEC00-04115 Final1/16/20011/16/20011/16/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/16/2001 at 09:25:12. Contact: ###-####.
MEC01-00150 Final1/16/20011/16/20011/16/2001 12:00:00 AMPPASS
###-####: Gas fireplace 1/16/2001 2:40:54 PM
MEC01-00151 Final1/16/20011/16/20011/16/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/16/2001 at 10:15:24. Contact: ###-####.: Draftstop/fire caulk needed, c/n issued. 1/16/2001 4:07:49 PM
BLD00-03311 BLD-Framing/Rough-in1/16/20011/16/20011/16/2001 12:00:00 AMPPASS
###-#### c/n dated 1/9/2001 corrected. 1/16/2001 2:05:45 PM
BLD00-03641 BLD-Footing1/16/20011/16/20011/16/2001 12:00:00 AMPPART
setback & 1/16/2001 3:07:57 PM soil conditions ok, reviewed rebar & HD with contractor. 1/16/2001 3:08:33 PM