Inspections for the day of: Tuesday, January 16, 2007.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02377 FIRE-Final Inspection1/15/20071/16/20071/17/2007 8:51:02 AMAPASS
Corrections have been verified, fire life safety inspection passed.
FIR06-00963 INSP-Final Inspection1/15/20071/16/20071/17/2007 8:50:24 AMAPASS
Field corrections are complete, fire alarm permit finaled.
BLD06-02377 FIRE-Final Inspection1/16/20071/16/20071/16/2007 4:12:22 PMPDONE
Duplicate inspection request.
BLD06-00688 FIRE-Conference1/9/20071/16/20071/16/2007 3:53:23 PMPDEFR
To be completed on 1/17 as agreed per telecon.
FIR06-00596 INSP-Final Inspection1/10/20071/16/20071/16/2007 3:43:56 PMPCANC
No time to complete inspection due to high volume of scheduled requests.
FIR06-00715 INSP-Final Inspection1/15/20071/16/20071/16/2007 3:42:51 PMPCANC
No time to complete inspection due to high volume of scheduled requests.
FIR06-00755 INSP-Sprinkler Rough-in1/16/20071/16/20071/16/2007 3:39:18 PMPFAIL
UG fire supply line is NOT approved for cover as the trenches are backfilled to the point that a sufficient inspeciton cannot be performed due to piping concealment. Contractor needs to expose the installation for viewing and request an additional inspection.
BLD04-02464 FIRE-Supply Line Flush1/16/20071/16/20071/16/2007 3:24:14 PMPNR
Lacking coordination to provide water supply for UG fire line flush.
FIR06-00764 INSP-Final Inspection1/11/20071/16/20071/16/2007 2:51:24 PMAPART
Sprinkler install appears satisfactory with respect to heads and spacing, however no access was provided above ceiling to verify pipe size, routing, attatchment methods, etc., final pending inspection of these items at next visit.
BLD06-00236 FIRE-Final Inspection1/16/20071/16/20071/16/2007 1:42:25 PMAPASS
Required corrections have been finished, fire life safety finaled.
FIR06-00677 INSP-Final Inspection1/12/20071/16/20071/16/2007 1:41:18 PMAPASS
Final fire sprinkler inspection passed, permit finaled.
FIR05-00772 INSP-Sprinkler Rough-in/Hydro1/15/20071/16/20071/16/2007 1:22:26 PMAFAIL
Air test failed due to start pressures below the min. amount allowed per NFPA 13.
MIS06-00285 FIR-Final1/12/20071/16/20071/16/2007 12:57:51 PMAPASS
One emergency light/exit sign at the main entry repaired while on site. Life safety inspection is acceptable.
FIR06-00540 INSP-Sprinkler Rough-in/Hydro1/12/20071/16/20071/16/2007 12:22:38 PMAPART
Inspection for the OH rough-in at the 4th floor SE quad portion as marked on approved plans is okay for cover, noted one head in a conference room to be relocated due to overspacing, one beam clamp in the men's restroom needs adjustment, walls for one room have not been built as shown on plans which may affect coverage if constructed as indicated, sprinklers in the electrical and telephone rooms shall be temp. rated per NFPA 13 2002 8.3.2.1, noted max. bending raduis must not be exceeded for flex head piping per manufacturer requirements, hydrostatic test for this portion of work is acceptable per discussion.
BLD06-02301 FIRE-Final Inspection1/12/20071/16/20071/16/2007 11:18:07 AMAPASS
Fire life safety inspection passed, noted one existing exit sign not functional on battery backup to be repaired today per agreement with contractor, also noted missing handle at the fire extinguisher cabinet to be installed ASAP.
BLD06-02052 FIRE-Final Inspection1/15/20071/16/20071/16/2007 10:56:12 AMAPASS
Fire life safety inspection is satisfactory.
FIR06-00646 INSP-Final Inspection1/16/20071/16/20071/16/2007 10:55:15 AMAPASS
Fire alarm permit finaled.
FIR06-00504 INSP-Conference1/11/20071/16/20071/16/2007 10:36:19 AMADONE
On site conference to discuss fire related HVAC issues.