Inspections for the day of: Tuesday, January 16, 2007.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00984 INSP-Final Inspection1/16/20071/16/20071/16/2007 5:40:02 PMPPASS
permit finaled
BLD05-03023 FIRE-Final Inspection1/15/20071/16/20071/16/2007 5:39:03 PMPPASS
Life safety passed.
FIR06-00222 INSP-Final Inspection1/11/20071/16/20071/16/2007 3:07:29 PMPCANC
Per contractor the project is not ready for a final inspection
BLD06-00907 FIRE-Final Inspection1/16/20071/16/20071/16/2007 2:43:53 PMPPASS
Life safety finaled
FIR06-00789 INSP-Sprinkler Rough-in/Hydro1/11/20071/16/20071/16/2007 12:52:00 PMAPASS
Overhead hydro test passed.
BLD06-02662 FIRE-Final Inspection1/16/20071/16/20071/16/2007 12:35:55 PMPPASS
permit finaled
BLD06-02501 FIRE-Final Inspection1/16/20071/16/20071/16/2007 12:35:34 PMPPASS
life safety finaled
FIR07-00021 INSP-Final Inspection1/16/20071/16/20071/16/2007 11:12:53 AMPPASS
permit finaled
FIR07-00021 INSP-Final Inspection1/12/20071/16/20071/16/2007 11:10:05 AMAPASS
permit finaled
BLD06-01467 FIRE-Final Inspection1/12/20071/16/20071/16/2007 11:03:45 AMAPASS
Life safety finaled
BLD06-01466 FIRE-Final Inspection1/12/20071/16/20071/16/2007 11:01:11 AMAPASS
life safety finaled
FIR06-00829 INSP-Final Inspection1/16/20071/16/20071/16/2007 11:00:39 AMPPASS
permit finaled
FIR06-00977 INSP-Sprinkler Rough-in/Hydro1/15/20071/16/20071/16/2007 10:57:41 AMAPASS
The remaining areas of the 2nd floor tenant inprovement are ok to cover.
FIR06-00774 INSP-Sprinkler Rough-in/Hydro1/12/20071/16/20071/16/2007 9:48:52 AMAFAIL
Need to redo the test since the account had not been set up at the monitoring agency. Also need the map at the facp.
FIR06-00631 INSP-Final Inspection1/15/20071/16/20071/16/2007 9:46:37 AMAFAIL
Provide correct backflow or data sheet proving friction loss as calculated has not been exceeded. Provide forward flush. Provide permanant heat, insulation above ceiling in the riser room and provide a one hour rated room.
FIR06-00803 FIR-Aging Inspection1/16/20071/16/20071/16/2007 9:02:00 AM NR
work is still in progress
MIS06-00338 FIR-Final1/16/20071/16/20071/16/2007 12:00:00 AMPCANC
Need earlier inspection before customers come in