Inspections for the day of: Friday, January 16, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00674 INSP - Stop Work Order1/16/20091/16/20091/16/2009 6:22:50 PMPPASS
All issues with the Correction Notice to the Stop Work Order have been adressed and all violation have been corrected. A concrete washout will not be provided due to all concrete and mortar work is complete.
Stop Work Order was lfited.
ESC08-00467 Site Final1/13/20091/16/20091/16/2009 6:20:24 PMAFAIL
Project has not been permanently stabilized. All temporary BMP's in place. Instructed RP what types would be accepted for a site final. Was instructed by the RP that the home owner would be the one responsible for stabilizing the hill slope. Until that time I have instructed the RP to keep all temporary bmp's inplace until final stabilization is achieved.
ESC08-00968 Tracking Control1/15/20091/16/20091/16/2009 2:57:07 PMPPASS
Sweeper came trough and cleaned up all sediment off of the roadway.
ESC08-00814 Tracking Control1/14/20091/16/20091/16/2009 2:56:19 PMPPASS
ESC08-00736 Tracking Control1/14/20091/16/20091/16/2009 2:56:04 PMPPART
Spoke with contactor to clean up sediment off of sidewalk by the end of the day.
ESC08-00924 General Inspection1/16/20091/16/20091/16/2009 11:44:10 AMAPASS
Discussed with RP onsite:
Went over if they were to discharge back into the wetland area with clean water to be aware of the channel and how much silt has built up where the water would be flowing. Was told that pumps will be shut off within 7 to 10 days. Will randomly inspect through the duration of the project until final stabilization has been achived in all areas of disturbance.
ESC08-01042 Site Preparation1/16/20091/16/20091/16/2009 10:35:33 AMPCANC
Julia Davis/Zoo area:
All tracking is cleaned up. No issues present. No work activity occuring during the process of the inspection.
ESC08-00953 General Inspection1/16/20091/16/20091/16/2009 9:20:10 AMAFAIL
Verbal to RP:
Clean up all trash debris off of lot and driveway and place into the trash container provided. Also sweep up all hard surfaces (including driveway/ RV access) of all sediment and debris.
Street has been swept from pervious inpections from the other inspectors request.
Will re-inspect on 1/21/09.
ESC08-01037 Site Preparation1/16/20091/16/20091/16/2009 9:16:42 AM FAIL
Verbal to RP:
Clean up all sediment off of sidewalks on a daily basis.
Street has been swept from pervious inpections from the other inspectors request.
Will re-inspect on 1/21/09.
ESC08-00706 Tracking Control1/16/20091/16/20091/16/2009 8:58:57 AMAFAIL
Verbal correction to RP:
Clean up all sediment (tracking) off of street area by 1/21/09 AM. Will re-inspect on 1/21/09 PM.