Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-03664 FIRE-Final Inspection1/16/20151/16/20151/16/2015 5:26:04 PMPPASS
Verified previous correction notice items. Fire life safety finaled.
BLD12-02886 FIRE-Final Inspection1/16/20151/16/20151/16/2015 4:23:07 PMPPASS
C/N items completed. Fire life safety finaled.
FIR14-00261 INSP-Final Inspection1/16/20151/16/20151/16/2015 4:21:27 PMPPASS
Correction items finished. Final walkthrough passed.
FIR14-00103 INSP-Final Inspection1/16/20151/16/20151/16/2015 4:20:24 PMPPASS
UG fire supply line permit final approved.
FIR14-00708 INSP-Sprinkler Rough-in/Hydro1/16/20151/16/20151/16/2015 3:52:46 PMAPART
Cover inspection for 3rd and 2nd floor E wing wet system at living units only- Completed with reviewed as-builts to match field installation per agreement. Need to adjust tenting at the 2" main 3rd floor NW end, noted three branchlines 2nd floor which do not correlate to the actual install. Okayed for 3rd floor cover, 2nd okayed pending accurate drawings.
BLD14-03663 FIRE-Final Inspection1/15/20151/16/20151/16/2015 3:45:58 PMAPASS
Scope of permit work completed. Fire life safety inspection passed.
FIR14-00683 INSP-Sprinkler Rough-in1/15/20151/16/20151/16/2015 12:07:54 PMPCANC
BLdg J dry and partial wet
Please call Leroy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
BLD15-00084 FIRE-Final Inspection1/15/20151/16/20151/16/2015 11:28:10 AMAPASS
Life safety inspection passed. Fire extinguishers to be provided with a current re-certification today as agreed.
FIR15-00028 INSP-Final Inspection1/15/20151/16/20151/16/2015 11:04:57 AMAPASS
Scope of fire alarm work completed and passed functional testing. Permit finaled.
FIR14-00889 INSP-Sprinkler Rough-in1/16/20151/16/20151/16/2015 7:50:04 AMAPART
Completed rough-in inspection of the new dry system at the 2nd floor parking garage- items noted include; overspacing between two branchlines west end, missing coverage at the vestibule, provide flexible couplings at riser main between floors, missing forward flow provision at the riser, new outside WF bell needed, revise existing FDC signage.