MIS18-00007
| ELE-Conference | 1/8/2018 | 1/16/2018 | 1/17/2018 11:47:03 AM | A | PASS |
|
|
Follow up. Owner has asked electrical contractor to complete heat tape installation.
|
ELE18-00183
| Rough-In Permanent Service | 1/15/2018 | 1/16/2018 | 1/16/2018 9:38:21 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer Install all reccessed cans at time of rough-in, install guard strips along NM with-in 6ft of attic access, Provide divider in chime box between line and low voltage, Staple NM along framing members as needed
|