BLD18-04521
| BLD-Framing/Rough-in | 1/16/2020 | 1/16/2020 | 1/17/2020 7:10:36 AM | P | PART |
|
|
2nd. floor, neeeds to complee firecaulking at toilets and tub drains. Provide UL listed assembly for through penetrations of fresh air intakes at 1hr. fire barrier walls.
|
BLD19-04949
| BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 4:27:03 PM | P | PASS |
|
|
Brian Phone #: ###-####
|
BLD19-04950
| BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 4:26:49 PM | P | PASS |
|
|
Brian Phone #: ###-####
|
BLD19-04255
| BLD-Energy code compliance | 1/15/2020 | 1/16/2020 | 1/16/2020 1:47:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-04255
| BLD-Framing/Rough-in | 1/15/2020 | 1/16/2020 | 1/16/2020 1:47:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-04991
| BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 12:56:01 PM | A | PEND |
|
|
Memo Garcia ###-#### (mech insp is scheduled for this AM). Needs mech final to pass.
|
BLD19-02013
| BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 9:49:49 AM | A | NR |
|
|
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech final.
|
BLD19-02012
| BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 9:49:27 AM | A | NR |
|
|
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech final.
|
BLD19-01141
| BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 9:48:40 AM | A | PEND |
|
|
Alex Phone #: ###-####. everything ok, need final letter from 3rd. party inspection firm.
|
BLD19-03364
| BLD-Framing/Rough-in | 1/15/2020 | 1/16/2020 | 1/16/2020 8:59:40 AM | A | PASS |
|
|
Sam Phone #: ###-####. All framing correction have been made. Ok to insulate.
|
BLD19-04765
| BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 8:43:19 AM | A | PASS |
|
|
Alice Phone #: ###-####. All issues resolved. Ok for perm occ.
|