BLD00-03018
| BLD-Final | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 16:30:37. Contact: ###-####.
|
BLD00-03351
| BLD-Framing/Rough-in | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 17:05:34. Contact: ###-####.c/n plumbing insp. brace wall rear screen work area. 1/17/2001 11:21:49 AM
|
BLD00-03525
| BLD-Final | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | NR |
|
|
Walter ###-####
|
BLD00-03041
| BLD-Footing | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PART |
|
|
###-#### wip. 1/17/2001 11:30:34 AM
|
MEC01-00140
| Pressure Test | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | FAIL |
|
|
###-####
|
BLD00-00990
| BLD-Final | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | FAIL |
|
|
###-####c/n posted. 1/17/2001 2:36:36 PM
|
BLD00-03231
| BLD-Other | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 09:10:57. Contact: ###-####.ceiling grid.ok to tile. 1/17/2001 2:55:17 PM
|
BLD00-03231
| BLD-Other | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 09:10:57. Contact: ###-####.ceiling grid.ok to tile. 1/17/2001 2:55:17 PM
|
BLD00-03232
| BLD-Other | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 09:12:03. Contact: ###-####.ceiling grid ok to tile.c/n posted for corridor firewall. 1/17/2001 3:53:10 PM
|