BLD00-03391
| BLD-Other | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 11:27:04. Contact: ###-####.
main floor party fire wall ok to stand 1/17/2001 10:47:58 AM
|
BLD00-03390
| BLD-Other | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 11:27:54. Contact: ###-####.
lower fire wall ok, party wall 1/17/2001 10:47:15 AM
|
BLD00-03105
| BLD-Conference | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | CANC |
|
|
###-#### call first
canc. to pm 1/17/2001 12:47:02 PM
|
BLD00-02612
| BLD-Framing/Rough-in | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | FAIL |
|
|
###-####
c/ n posted, ok to insulate un affected areas 1/17/2001 12:05:00 PM
|
MIS01-00003
| BLD-Final | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PASS |
|
|
###-####
c of o signed 1/17/2001 12:43:43 PM
|
MEC01-00105
| Rough-in | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 17:20:25. Contact: ###-####.
c/n ok, pressure test ok 1/17/2001 12:05:25 PM
|
BLD00-01497
| BLD-Conference | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PASS |
|
|
###-####
conf. on stairways, does not meet code now 1/17/2001 1:20:18 PM
|
BLD00-00142
| BLD-Final | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PASS |
|
|
Glen, ###-####
temp. occ. ok ////ok fo perm. occ. after other perm.sign offs. 1/17/2001 2:56:49 PM
|
MEC00-04368
| Rough-in | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 11:08:07. Contact: ###-####.
c/n for final 1/17/2001 2:22:49 PM
|
MEC01-00177
| Rough-in | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | FAIL |
|
|
for fireplace only Shawna ###-####
not ready 1/17/2001 3:16:42 PM
|
MEC01-00065
| Final | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PASS |
|
|
###-#### Nancy or Peter Grayson
|