BLD00-02637
| BLD-Final | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 11:32:32. Contact: .Cert. of Comp. issued 1/17/2001 11:50:43 AM
|
BLD00-03131
| BLD-Final | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | FAIL |
|
|
George ###-#### c/n issued, needs gaskets or caulking on outside outlet boxes. 1/17/2001 12:28:44 PM
|
BLD00-03440
| BLD-Wall cover | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 12:59:19. Contact: .Shear-Ok to side 1/17/2001 11:58:34 AM
|
BLD00-03090
| BLD-Framing/Rough-in | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 17:24:48. Contact: ###-####. c/n issued, 1) draftstop in kitchen; 2) air seal needed in outside stud penetrations, 3) T37 need additional brace. 1/17/2001 12:51:12 PM
|
MEC00-04393
| Rough-in | 1/12/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 09:42:37. Contact: ###-####.Performed r/in inspection per request on 1/16/01-informed contactor via phone. 1/16/2001 11:19:29 AM
|
MEC00-03403
| Final | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 09:02:56. Contact: ###-####.
|
MEC00-04518
| Final | 1/16/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 11:14:44. Contact: ###-####.
|
BLD01-00040
| BLD-Footing | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PASS |
|
|
Bob ###-####
|
MEC01-00144
| Final | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 10:20:30. Contact: ###-####. Pressure test. 1/17/2001 2:38:30 PM
|
BLD00-03641
| BLD-Foundation | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PART |
|
|
Mana ###-#### Appears ok, not totally ready for concrete at time of inspection, hd not inplace. 1/17/2001 3:48:48 PM
|
MIS01-00003
| BLD-Final | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 415 On 1/17/2001 11:54:27 AM Inspector 415 did am 1/17/2001 12:52:41 PM
|
BLD00-03105
| BLD-Conference | 1/17/2001 | 1/17/2001 | 1/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 415 On 1/17/2001 11:55:51 AM Ok to insulate. 1/17/2001 1:27:26 PM
|
MEC00-04518
| Pressure Test | 1/16/2001 | 1/17/2001 | 1/16/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 11:15:00. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/16/2001 at 14:39:56.
|