Inspections for the day of: Wednesday, January 17, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-03981 Final1/15/20011/17/20011/17/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/15/2001 at 13:51:03. Contact: ###-####.
MEC00-03982 Final1/15/20011/17/20011/17/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/15/2001 at 13:52:06. Contact: ###-####.
BLD00-02951 BLD-Final1/16/20011/17/20011/17/2001 12:00:00 AMAPASS
1234 enter for keyless garage door\\ or key under water heater\\###-####
BLD00-02770 BLD-Footing1/17/20011/17/20011/17/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/17/2001 at 06:48:25. Contact: ###-####. crew still working on rebar spec inspector will be on site to final 1/17/2001 12:17:01 PM
BLD00-03137 BLD-Foundation1/16/20011/17/20011/17/2001 12:00:00 AMAPASS
WILL POUR AT 10;00-- JIM ###-#### FOUND
BLD00-02434 BLD-Other1/16/20011/17/20011/17/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/16/2001 at 18:03:23. Contact: ###-####.insulation and seal kit ok tocover 1/17/2001 1:06:23 PM
BLD00-03415 BLD-Energy code compliance1/17/20011/17/20011/17/2001 12:00:00 AMPPASS
###-####
BLD00-03700 BLD-Foundation1/17/20011/17/20011/17/2001 12:00:00 AMPPASS
Dane ###-####
BLD99-03066 BLD-Final1/17/20011/17/20011/17/2001 12:00:00 AMPFAIL
Bill Davis ###-#### c/n on site temp glass breackfast nook can lighting in ceiling not sealed tap /sael around elec breaker box in garage 1/17/2001 2:58:13 PM
BLD01-00054 BLD-Footing1/17/20011/17/20011/17/2001 12:00:00 AMPPART
###-####
BLD00-02780 BLD-Framing/Rough-in1/16/20011/17/20011/17/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/16/2001 at 13:50:16. Contact: ###-####.ok to insulate c/n on site need two studs under twoply beem back door 1/17/2001 2:31:35 PM
BLD00-03270 BLD-Framing/Rough-in1/16/20011/17/20011/17/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/16/2001 at 13:53:54. Contact: ###-####. 1/17/2001 12:43:51 PM shear nailing ok but need engineering for two set of hold downs not enstalled 1/17/2001 3:47:38 PM