Inspections for the day of: Thursday, January 17, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02796 BLD-Aging Inspection1/17/20021/17/20021/17/2002 12:00:00 AM PART
wip 1/17/2002 9:17:28 AM
BLD01-02822 BLD-Other1/16/20021/17/20021/17/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/16/2002 at 13:48:49. Contact: ###-####.c/n posted on shear 1/17/2002 11:34:26 AM
MEC02-00066 Pressure Test1/16/20021/17/20021/17/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/16/2002 at 13:56:43. Contact: ###-####.only 10 psi 1/17/2002 11:02:14 AM
MEC01-03662 Rough-in1/16/20021/17/20021/17/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/16/2002 at 14:04:00. Contact: ###-####.
BLD01-01635 BLD-Framing/Rough-in1/16/20021/17/20021/17/2002 12:00:00 AMAPART
2928 w hester is ready\\###-####
2928 side only, ok to insulate , verify energy seal package @ insulation inspection, strap top plate @ 2 places 1/17/2002 10:03:28 AM
BLD01-03096 BLD-Framing/Rough-in1/16/20021/17/20021/17/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/16/2002 at 15:19:31. Contact: .ok to insulate, change headers out of existing int. bearing wall, brace trusses 1/17/2002 10:43:19 AM
BLD01-03096 BLD-Energy code compliance1/16/20021/17/20021/17/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/16/2002 at 15:20:17. Contact: .
seal ok only, need to call in for energy code 1/17/2002 10:40:55 AM
BLD01-01889 BLD-Final1/17/20021/17/20021/17/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/17/2002 at 08:17:32. Contact: ###-####.need trades signed offf, including Terry Records on hillside 1/17/2002 3:23:17 PM
BLD01-02793 BLD-Framing/Rough-in1/17/20021/17/20021/17/2002 12:00:00 AMPPART
###-####
c/n posted, ok to insulate after mech pass 1/17/2002 1:56:49 PM
BLD02-00066 BLD-Framing/Rough-in1/17/20021/17/20021/17/2002 12:00:00 AMPPASS
###-####
BLD01-03233 BLD-Footing1/17/20021/17/20021/17/2002 12:00:00 AMPPART
foundation ok, wip 1/17/2002 3:22:05 PM
MEC02-00151 Final1/17/20021/17/20021/17/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/17/2002 at 10:58:05. Contact: ###-####.
MEC01-03662 Rough-in1/17/20021/17/20021/17/2002 12:00:00 AMPPASS
331--1839, reinspection 1/17/2002 11:49:19 AM