BLD01-02800
| BLD-Aging Inspection | 1/17/2002 | 1/17/2002 | 1/17/2002 12:00:00 AM | | DONE |
|
|
done with out inspection 1/17/2002 11:03:37 AM
|
BLD01-02797
| BLD-Aging Inspection | 1/17/2002 | 1/17/2002 | 1/17/2002 12:00:00 AM | | DONE |
|
|
done with out inspection 1/17/2002 11:03:09 AM
|
BLD01-01067
| BLD-Framing/Rough-in | 1/16/2002 | 1/17/2002 | 1/17/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 425 On 1/16/2002 4:21:08 PM c/n on site 1/17/2002 11:04:06 AM
|
BLD01-01068
| BLD-Framing/Rough-in | 1/16/2002 | 1/17/2002 | 1/17/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 425 On 1/16/2002 4:21:57 PM shear nailing ok to cover ext 1/17/2002 11:04:38 AM
|
BLD01-02470
| BLD-Framing/Rough-in | 1/17/2002 | 1/17/2002 | 1/17/2002 12:00:00 AM | P | FAIL |
|
|
###-#### shear nailing HD hold downs not bolted down in walls panels not nailed per plans 1/17/2002 2:41:10 PM
|
BLD01-02399
| BLD-Footing | 1/16/2002 | 1/17/2002 | 1/17/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/16/2002 at 13:15:06. Contact: ###-####. mti on site they have inspected the rebar and are testing thwe concrete all ok 1/18/2002 9:04:09 AM
|