BLD05-03347
| BLD-Framing/Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 3:33:27 PM | P | PASS |
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. interoir partition walls. ok to insulate.
|
BLD05-02488
| BLD-Framing/Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 3:31:49 PM | P | FAIL |
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Complete lateral bracing. Install simpson LS50 hangars as shown on truss engineering. Check spacing of nailing pattern on south shear wall. (4 inches oc) ok to insulate. c/n posted.
|
BLD05-02487
| BLD-Framing/Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 3:28:30 PM | P | CANC |
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-02853
| BLD-Framing/Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 3:28:11 PM | P | FAIL |
|
|
shear nail inspection//please call when on way so can bring you a ladder//ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. No approved plans on site.
|
BLD05-02394
| BLD-Footing | 1/17/2006 | 1/17/2006 | 1/17/2006 3:13:44 PM | P | PART |
|
|
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Conc placed when on site. Noted that contractor had special insp.
|
BLD05-01771
| BLD-Energy code compliance | 1/17/2006 | 1/17/2006 | 1/17/2006 1:21:57 PM | P | PASS |
|
|
duane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Airseal p[ackage was completed.
|
BLD05-01771
| BLD-Framing/Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 1:21:22 PM | P | PASS |
|
|
duane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. All simpson hangars have been nailed.
|
BLD05-03125
| BLD-Footing | 1/17/2006 | 1/17/2006 | 1/17/2006 11:28:46 AM | P | CANC |
|
|
brian Note: around 2:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Marsha Smylie
|
BLD05-02695
| BLD-Footing | 1/16/2006 | 1/17/2006 | 1/17/2006 10:57:24 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 1/16/2006 at 5:11:58 PM. Contact: ###-####. Footings are being repositioned, set backs are incorrect. wip.
|
BLD05-02702
| BLD-Footing | 1/16/2006 | 1/17/2006 | 1/17/2006 10:56:36 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 1/16/2006 at 5:10:21 PM. Contact: ###-####. Footings are being repostioned, set backs were incorrect. wip.
|
BLD05-02765
| BLD-Footing | 1/16/2006 | 1/17/2006 | 1/17/2006 10:55:49 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 1/16/2006 at 4:46:00 PM. Contact: ###-####. Footings bieng repositioned, set backs were incoorect. wip.
|
BLD05-01972
| BLD-Framing/Rough-in | 1/13/2006 | 1/17/2006 | 1/17/2006 9:31:17 AM | A | FAIL |
|
|
please call 30 min prior to meet//calvin; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Provide elec. permit and r.i. inspection. Provide mech. r.i. reinspection. Install all missing headers as indicated on plans. Provide truss engineering to complete framing inspection. Provide engineering for repair of cut trusses. Do not cover. c/n posted.
|
BLD05-02722
| BLD-Framing/Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 12:00:00 AM | P | CANC |
|
|
marty ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--already passed for fr??
|