Inspections for the day of: Wednesday, January 17, 2007.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00982 INSP-Conference1/17/20071/17/20071/17/2007 5:06:15 PMPPASS
Field inspection passed regarding fire sprinkler permit work.
FIR06-00596 INSP-Alarm Testing1/16/20071/17/20071/17/2007 5:04:34 PMAPART
Partial inspection for the 5th floor completed today including guest rooms, meeting rooms, laundry service and employee areas, and guest services. Need to provide an additional SD in the meeting storage room due to beam obstruction, testing of SD's in the common corridors pending clean hall conditions, heat detectors not tested at this time, programming issue at room 512 repaired while on site, elevator lobby and sprinkler floor controls remain to be tested, EOL, pulls, dampers, DH, and notification tested okay.
MIS06-00336 FIR-Final1/17/20071/17/20071/17/2007 2:03:48 PMPFAIL
Provide permit documentation on site as required per condition.
MIS06-00334 FIR-Final1/17/20071/17/20071/17/2007 2:02:23 PMPFAIL
Need to provide permit documentation on site.
MIS06-00335 FIR-Final1/17/20071/17/20071/17/2007 2:01:39 PMPFAIL
Permit documentation must be available on site.
BLD06-00688 FIRE-Conference1/16/20071/17/20071/17/2007 1:55:07 PMPDONE
On site discussion regarding floor control valve manifold locations and accessibility requirements, also discussed duct detectors and bld fire code review notes.
FIR06-00688 INSP-Final Inspection1/16/20071/17/20071/17/2007 12:12:18 PMAPASS
Fire alarm passed field inspection, permit finaled.
FIR06-00907 INSP-Final Inspection1/12/20071/17/20071/17/2007 12:11:26 PMAPART
OH fire sprinkler is acceptable pending install of two missing escutcheons, one missing hanger. Also noted three uprights above the celing recommended to to be removed.
FIR05-00772 INSP-Sprinkler Rough-in1/16/20071/17/20071/17/2007 10:12:21 AMAPART
Begin 24 hr. air test at 10:00 am, start psi. at system 2 is 40.5, system 1 is 40 psi.