Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00631 INSP-Conference1/17/20071/17/20071/18/2007 9:38:02 AMPDONE
alan is working on the permanant heat issue
BLD06-01012 FIRE-Final Inspection1/17/20071/17/20071/17/2007 3:48:44 PMPFAIL
Provide fire alarm permit for the interconnection of the door mags and the fire alarm system per IFC 1008.1.4.3
BLD06-01218 FIRE-Final Inspection1/17/20071/17/20071/17/2007 3:47:11 PMPPASS
life safety finaled
FIR06-00222 INSP-Final Inspection1/16/20071/17/20071/17/2007 3:42:26 PMPFAIL
There are still alot of problems. To start with the resubmitted plans do not show all of the added heads. One head is missing in the dining area. Another head is too close to a ornamental wood piece above a door. Neither the fitter or I could dislodge the access panel to the crawl space to verify pipe size and insulation as previously marked. There was no head within 12" of the riser. The riser is too far from the wall. No supply pressure guage was installed. The test and drain was not ran to the exterior. Plans need to be resubmitted with all of the information provided. Underground flush passed.
FIR06-00774 INSP-Final Inspection1/17/20071/17/20071/17/2007 2:32:11 PMPPASS
permit finaled
FIR06-00715 INSP-Final Inspection1/16/20071/17/20071/17/2007 1:11:27 PMPFAIL
I gave Don with Russell Corp. permission to use the phase one area of the third floor. See the building approved plans for the exact location marked and signed by me that was inspected. The items remaining include providing an air balance report for the hood and a K class extinguisher. Only the portion of the phase one area on the third floor alarm was tested. The other area was not complete. The lobby areas of the first and second floor fire alarm was tested. This includes the new facp panel, NAC panel, phone lines and elevator recall. See the approved fire alarm prints for devices marked "ok" that have been tested. Signals have been verified as well. Need 120volt monitoring of the elevator power and the correct orfice in the inspectors test connection. Asbuilts will be required to be submitted to the city prior to final.
BLD06-01887 FIRE-Final Inspection1/17/20071/17/20071/17/2007 1:08:50 PMPFAIL
I gave Don with Russell Corp. permission to use the phase one area of the third floor. See the building approved plans for the exact location marked and signed by me that was inspected. The items remaining include providing an air balance report for the hood and a K class extinguisher. Only the portion of the phase one area on the third floor alarm was tested. The other area was not complete. The lobby areas of the first and second floor fire alarm was tested. This includes the new facp panel, NAC panel, phone lines and elevator recall. See the approved fire alarm prints for devices marked "ok" that have been tested. Signals have been verified as well. Need 120volt monitoring of the elevator power and the correct orfice in the inspectors test connection. Asbuilts will be required to be submitted to the city prior to final.
BLD06-03259 FIRE-Conference1/16/20071/17/20071/17/2007 12:56:53 PMADONE
Contractor wanted to know if curtain boards and smoke/heat removal vents could be removed. I deferred the question to the plan reviewer, sam or scott.
MIS06-00338 FIR-Final1/16/20071/17/20071/17/2007 12:14:25 PMAFAIL
exit signs and emergency lights still do not work
FIR06-00936 INSP-Final Inspection1/16/20071/17/20071/17/2007 12:13:22 PMAPASS
Hood suppression system operated correctly. Permit finaled
BLD06-00119 FIRE-Final Inspection1/16/20071/17/20071/17/2007 9:35:40 AMAPASS
permit finaled
BLD06-00120 FIRE-Final Inspection1/16/20071/17/20071/17/2007 9:33:53 AMAPASS
life safety finaled
FIR06-00774 INSP-Final Inspection1/16/20071/17/20071/17/2007 8:53:51 AMAFAIL
signals are still screwed up. Now the monitoring agency is not getting the supervisory signals. Everything is coming in as zone one.
FIR06-00872 INSP-Final Inspection1/16/20071/17/20071/16/2007 12:35:10 PMAPASS
permit finaled