FIR12-00007
| INSP-Final Inspection | 1/17/2012 | 1/17/2012 | 1/17/2012 3:42:21 PM | P | PASS |
|
|
permit finaled
|
FIR11-00215
| INSP-Final Inspection | 1/13/2012 | 1/17/2012 | 1/17/2012 3:33:25 PM | A | CANC |
|
|
mary Phone #: ###-#### To be rescheduled for tomorrow.
|
FIR11-00621
| INSP-Supply line flush | 1/16/2012 | 1/17/2012 | 1/17/2012 3:25:22 PM | P | PASS |
|
|
The underground flush passed.
|
FIR11-00517
| INSP-Sprinkler Rough-in | 1/17/2012 | 1/17/2012 | 1/17/2012 3:23:51 PM | P | PASS |
|
|
See the city approved plans for the west side, fourth floor, resident rooms where the sprinkler piping can be covered now that the tenting is done. Raul repaired the tenting in rooms 404, 407 and 408 while I waited. The approval for cover does not include the west side, fourth floor corridor as that piping has not been installed yet.
|
FIR12-00004
| INSP-Sprinkler Rough-in | 1/17/2012 | 1/17/2012 | 1/17/2012 3:21:33 PM | P | PASS |
|
|
Sprinkler piping can be covered. I noted several areas where the existing sprinkler pendants are located too close together and located too far off of walls.
|
FIR11-00686
| INSP-Final Inspection | 1/17/2012 | 1/17/2012 | 1/17/2012 2:32:43 PM | P | PASS |
|
|
Permit finaled. Hood supppression system operated correctly
|
FIR12-00012
| INSP-Final Inspection | 1/17/2012 | 1/17/2012 | 1/17/2012 2:32:09 PM | P | PASS |
|
|
Permit finaled
|
BLD11-02975
| FIRE-Final Inspection | 1/17/2012 | 1/17/2012 | 1/17/2012 11:32:22 AM | P | PASS |
|
|
life safety passed
|
BLD12-00009
| FIRE-Final Inspection | 1/17/2012 | 1/17/2012 | 1/17/2012 11:05:16 AM | P | PASS |
|
|
life safety passed
|
FIR11-00621
| INSP-Sprinkler Rough-in | 1/17/2012 | 1/17/2012 | 1/17/2012 11:01:34 AM | P | PASS |
|
|
Underground supply line is ok to cover.
|
FIR11-00517
| INSP-Sprinkler Rough-in | 1/13/2012 | 1/17/2012 | 1/17/2012 9:31:14 AM | A | FAIL |
|
|
The tenting had only been completed in acouple of rooms. Will re-inspect when I come back for the underground flush this afternoon.
|