FIR13-00015
| INSP-Final Inspection | 1/17/2013 | 1/17/2013 | 1/18/2013 1:37:22 PM | P | PART |
|
|
|
FIR12-00147
| FIR-Aging Inspection | 1/17/2013 | 1/17/2013 | 1/18/2013 1:12:22 PM | | DONE |
|
|
wip
|
FIR13-00002
| INSP-Final Inspection | 1/16/2013 | 1/17/2013 | 1/17/2013 5:01:02 PM | P | PART |
|
|
Provide WP strobe at one location per plan, need to verify coverage at both conference rooms when construction is complete. Remainder of appliances tested okay.
|
FIR12-00738
| INSP-Sprinkler Rough-in | 1/17/2013 | 1/17/2013 | 1/17/2013 4:58:04 PM | P | PART |
|
|
Verified C/N items.
|
BLD12-02799
| FIRE-Final Inspection | 1/15/2013 | 1/17/2013 | 1/17/2013 4:57:04 PM | A | PART |
|
|
Final pending alarm permit work.
|
BLD12-03262
| FIRE-Conference | 1/17/2013 | 1/17/2013 | 1/17/2013 4:55:59 PM | A | DONE |
|
|
|