ELE12-02415
| ELE-Aging Inspection | 1/17/2017 | 1/17/2017 | 1/24/2017 6:56:46 AM | | DONE |
|
|
Job was turned over to Code Enforcement on 3/16/15
|
MIS17-00014
| ELE-Conference | 1/17/2017 | 1/17/2017 | 1/20/2017 7:24:21 AM | P | DONE |
|
|
Possible work without permits. Talked with Linda. She is currently in the process of working with Boise City.
|
ELE12-02468
| ELE-Aging Inspection | 1/17/2017 | 1/17/2017 | 1/19/2017 8:08:06 AM | | DONE |
|
|
Talked to contractor in late December. Said he was going to try to clear up all aging permits.
|
ELE12-02398
| ELE-Aging Inspection | 1/17/2017 | 1/17/2017 | 1/19/2017 7:49:03 AM | | DONE |
|
|
No inspection requested at this time.
|
ELE16-02886
| Electrical Rough-In | 1/17/2017 | 1/17/2017 | 1/18/2017 10:43:55 AM | P | DONE |
|
|
This inspection is 4 the bathroom heated floors pre inspection to ensure dedicated circuits 2 the bathrooms for that purpose and for inspection only Phone #: ###-#### Inspection requested via web by David McClellan Dedicated circuits for floor heat locations.
|
ELE17-00069
| Final | 1/16/2017 | 1/17/2017 | 1/17/2017 2:10:10 PM | A | PASS |
|
|
Access code 1191. David Forbes electrician: ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Ok final
|
ELE16-03983
| Permanent Service | 1/16/2017 | 1/17/2017 | 1/17/2017 1:57:50 PM | P | PASS |
|
|
Permanent power building W Phone #: ###-#### Inspection requested via web by Bob Stephens p/s ug n ok. Service stickers located on side of mains
|
ELE16-02974
| Electrical Rough-In | 1/16/2017 | 1/17/2017 | 1/17/2017 1:49:55 PM | P | PASS |
|
|
Building S rough electrical Phone #: ###-#### Inspection requested via web by Bob Stephens rough ok cover
|
ELE16-02092
| Final | 1/15/2017 | 1/17/2017 | 1/17/2017 12:41:39 PM | P | PASS |
|
|
Inspect temp receptacles at meter which were installed due to the fire to provide construction power Phone #: ###-#### Inspection requested via web by Steve Craig Temp outlets still installed and not being removed as per Contractor.
|
ELE16-00442
| Electrical Rough-In | 1/17/2017 | 1/17/2017 | 1/17/2017 12:33:53 PM | P | PASS |
|
|
Jake Phone #: ###-#### 5th floor 8 cans in soffit in front of elevators Ok to cover
|
ELE16-03951
| Final | 1/16/2017 | 1/17/2017 | 1/17/2017 12:08:53 PM | A | PASS |
|
|
I will call in the morning to schedule a time to meet you onsite. Phone #: ###-#### Inspection requested via web by Matthew Dunay ok final
|
ELE17-00038
| Rough-In Permanent Service | 1/13/2017 | 1/17/2017 | 1/17/2017 10:56:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn p/s u/g n ok
|
ELE17-00082
| Rough-In Permanent Service | 1/13/2017 | 1/17/2017 | 1/17/2017 10:36:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk p/s u/g n ok
|
ELE16-03746
| Final | 1/15/2017 | 1/17/2017 | 1/17/2017 10:25:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald ok final
|
ELE16-03616
| Electrical Rough-In | 1/15/2017 | 1/17/2017 | 1/17/2017 10:05:26 AM | A | PASS |
|
|
Floor heat bathroom Phone #: ###-#### Inspection requested via web by John VanZandt floor heat ok cover
|
ELE16-02926
| Final | 1/15/2017 | 1/17/2017 | 1/17/2017 9:48:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald ok final
|
ELE17-00106
| Temporary Service | 1/16/2017 | 1/17/2017 | 1/17/2017 9:30:52 AM | A | PASS |
|
|
old service that we are using to temp Phone #: ###-#### Inspection requested via web by Neal Rumsey t/s o/h rec ok. Overhead is already swung, need power on existing panel
|
ELE16-02707
| Final | 1/13/2017 | 1/17/2017 | 1/17/2017 9:17:45 AM | A | PASS |
|
|
Building in back, access through alley - Curtis Phone #: ###-#### ok final
|
ELE17-00029
| Rough-In Permanent Service | 1/15/2017 | 1/17/2017 | 1/17/2017 8:37:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman p/s u/g n ok
|
ELE16-02886
| Electrical Rough-In | 1/14/2017 | 1/17/2017 | 1/15/2017 8:11:08 PM | A | CANC |
|
|
All 6 bathroom''s in 926, 928 are getting heated floors. Requesting floor inspection prior to install of floor wiring. Phone #: ###-#### >> Inspection requested via web by David McClellan Inspection cancelled from web by: David McClellan
|