ELE19-00148
| Rough-In Permanent Service | 1/15/2019 | 1/17/2019 | 1/17/2019 1:54:17 PM | P | PASS |
|
|
We are doing a meter upgrade and need an inspection for Idaho Power to turn the power back on around 1PM. I was not sure what you called this inspection, many jurisdictions call it a power to panel but I did not see that option. Please call Brian when you are on your way ###-#### Phone #: ###-#### Inspection requested via web by Ashley White Solar power install for service will need all main grounding elewctrodes installed at new main disc and isolate grounds and neutrals at panel... p/s o/h rec ok
|
ELE18-04486
| Permanent Service | 1/16/2019 | 1/17/2019 | 1/17/2019 1:47:22 PM | P | PASS |
|
|
Replaced Main Service. Phone #: ###-#### Inspection requested via web by Casey Fouts p/s o/h rec ok
|
ELE18-04155
| Final | 1/17/2019 | 1/17/2019 | 1/17/2019 1:19:57 PM | P | PART |
|
|
Partial Final // Tony Phone #: ###-#### Ok to move furniture in front of walls and receptacles
|
ELE19-00175
| Final | 1/17/2019 | 1/17/2019 | 1/17/2019 1:01:40 PM | P | PASS |
|
|
AC connection Phone #: ###-#### Inspection requested via web by Kevin Perez Corrections fixed final ok
|
ELE17-03268
| Final | 1/16/2019 | 1/17/2019 | 1/17/2019 12:57:47 PM | A | PASS |
|
|
at noon Final ok
|
ELE18-04289
| Electrical Rough-In | 1/14/2019 | 1/17/2019 | 1/17/2019 10:40:19 AM | A | NR |
|
|
Kevin Phone #: ###-#### Need boxes replaced as there is not even qu-in in boxes installed
|
ELE18-04428
| Rough-In Permanent Service | 1/16/2019 | 1/17/2019 | 1/17/2019 10:01:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon Rough-in ok to cover p/s u/g n ok
|
ELE19-00175
| Final | 1/16/2019 | 1/17/2019 | 1/17/2019 8:16:49 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Perez Inspection cancelled from web by: Kevin Perez
|