ELE19-00602
| Conference | 1/17/2020 | 1/17/2020 | 1/17/2020 2:00:48 PM | P | DONE |
|
|
Discussed the occupancy of parking garage in 30 days. General contractor will meet with city officials to determine a completion plan. BLD18-01831 states several subs will finish on hotel phase including electrical lighting and emergency lighting, generator back up, elevators, egress paths ect. Completion plan will determine what systems must be complete.
|
MIS19-00059
| ELE-Final | 1/17/2020 | 1/17/2020 | 1/17/2020 1:53:24 PM | P | PASS |
|
|
Able to confirm correction has been done by solar contractor. Final ok
|
ELE20-00176
| Permanent Service | 1/16/2020 | 1/17/2020 | 1/17/2020 11:29:03 AM | A | PASS |
|
|
Bush will be removed. Thanks Phone #: ###-#### Inspection requested via web by Barbara Szurgot Service lower to compliant height, bush removed to short stumps. p/s o/h rec ok
|
ELE19-00601
| Electrical Rough-In | 1/16/2020 | 1/17/2020 | 1/17/2020 11:02:17 AM | A | PASS |
|
|
Fifth floor wall and ceiling cover hotel. Contact is Danny Phone #: ###-#### Inspection requested via web by Buster Bowen Level 5 units 502 thru 524 walls and fire lids, West corridor walls and fire lids, south corridor fire lid only rough in ok cover.
|
ELE19-04338
| Electrical Rough-In | 1/16/2020 | 1/17/2020 | 1/17/2020 10:14:08 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Discussed GFCI protection of kitchen receptacles, All receptacles will require GFCI protection in commercial kitchens as per 210.8(B). 3 pole appliance ok to hardwire and provide a disconnecting means if contractor chooses due to GFCI devices are not available at 35 amp rating. Kitchen grid rough in ok cover.
|
ELE20-00157
| Final | 1/16/2020 | 1/17/2020 | 1/17/2020 9:53:11 AM | A | PASS |
|
|
Please call Lynn prior to arrival. Thank you! Phone #: ###-#### Inspection requested via web by Lynn Proctor This work not associated with BLD19-03683, lighting upgrade so space can be used for temp space while condtruction is taking place. Final ok
|
ELE20-00126
| Final | 1/16/2020 | 1/17/2020 | 1/17/2020 9:32:21 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dean Gernaat Final ok
|