ELE17-00783
| ELE-Aging Inspection | 1/17/2020 | 1/17/2020 | 1/22/2020 7:47:51 AM | | DONE |
|
|
waiting on permit holder
|
ELE19-01582
| Conference | 1/17/2020 | 1/17/2020 | 1/17/2020 2:46:34 PM | P | DONE |
|
|
Call Shannon on job site before you go out. Needing to discuss a couple things. Phone #: ###-#### Inspection requested via web by Deb Morton...discussed wiring of gas dispensor..clssification and wiring methods...wiring floor box
|
ELE20-00070
| Permanent Service | 1/13/2020 | 1/17/2020 | 1/17/2020 2:03:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Troy Cobb... p/s u/g reconnect ok
|
ELE20-00041
| Electrical Rough-In | 1/17/2020 | 1/17/2020 | 1/17/2020 1:26:41 PM | P | PASS |
|
|
addition rough-in for cover, between 1:30 and 2:30, if possible, much appreciated, Bob ###-#### Phone #: ###-#### Inspection requested via web by Dale Johnson... ok to cover...new nurser/bed, master bed, master bath and utillity rm...new sub panel in hallway
|
ELE20-00170
| Electrical Rough-In | 1/15/2020 | 1/17/2020 | 1/17/2020 12:34:53 PM | A | CANC |
|
|
rough-in/final for power to mobile home w/ existing permanent service. electrician not onsite, Matt Jones ###-####. can call office for more details. Phone #: ###-#### Inspection requested via web by Matthew White... should have been perm service inspection final inspection required once power turned on
|
ELE20-00170
| Permanent Service | 1/17/2020 | 1/17/2020 | 1/17/2020 12:33:44 PM | A | PASS |
|
|
rough-in/final for power to mobile home w/ existing permanent service. electrician not onsite, Matt Jones ###-####. can call office for more details. Phone #: ###-#### Inspection requested via web by Matthew White... p/s u/g new ok
|
ELE20-00085
| Temporary Service | 1/17/2020 | 1/17/2020 | 1/17/2020 12:20:48 PM | P | PASS |
|
|
Inspection requested via web by Bonnie Page.. t/s u/g ok
|
ELE20-00028
| Final | 1/16/2020 | 1/17/2020 | 1/17/2020 11:56:16 AM | A | PASS |
|
|
There will be guys there working. Please feel free to contact Fred ###-#### with any questions. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan... panel complete...ok to final
|
ELE19-04777
| Conference | 1/16/2020 | 1/17/2020 | 1/17/2020 11:38:03 AM | A | PASS |
|
|
Dominic Phone #: ###-####... discussed layout of outlets, make up, stapling, recessed can requirement, garage discussed outlet requirement where two pocket doors meet-no outlet
|
ELE20-00167
| Electrical Rough-In | 1/15/2020 | 1/17/2020 | 1/17/2020 9:49:19 AM | A | PASS |
|
|
Electrical Rough In for a Commercial Solar Installation Phone #: ###-#### Inspection requested via web by Bryan Lawley... UL listed equipment verified... images of rooftop electrical will be texted or emailed because of limited access to roof for final...open business at location seperate metering and disconnect will be at buildings meter pac...no consumer usage at building
|
ELE20-00153
| Electrical Rough-In | 1/17/2020 | 1/17/2020 | 1/17/2020 9:18:01 AM | A | PASS |
|
|
LED poles heads this morning. Phone #: ###-#### Inspection requested via web by Tim Dunlop...5 new LED heads...UL listing verified
|
ELE19-01582
| Electrical Rough-In | 1/16/2020 | 1/17/2020 | 1/17/2020 8:58:26 AM | A | PASS |
|
|
Ceiling inspection - please see Shannon Stepp onsite with any questions. Phone #: ###-#### Inspection requested via web by Deb Morton... grid areas ok to cover...5 outlets above grid will be moved into grid
|
ELE20-00058
| Rough-In Permanent Service | 1/16/2020 | 1/17/2020 | 1/17/2020 8:39:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe... rough ok p/s u/g new ok
|
ELE20-00192
| Electrical Rough-In | 1/17/2020 | 1/17/2020 | 1/17/2020 12:00:00 AM | P | CANC |
|
|
Rough-in inspection for sheetrock cover.
Please call prior to arrival for access. Phone #: ###-#### >> Inspection requested via web by Kevin Perez // per jared canceled inspection for today ###-####
|