BLD19-01278
| BLD-Final | 1/16/2020 | 1/17/2020 | 1/21/2020 2:54:44 PM | P | PEND |
|
|
Todd Phone #: ###-####
|
BLD19-03280
| BLD-Energy code compliance | 1/16/2020 | 1/17/2020 | 1/21/2020 8:06:48 AM | P | PART |
|
|
robert Phone #: ###-####,, ok to cover main area
|
BLD19-01649
| BLD-Wall cover | 1/17/2020 | 1/17/2020 | 1/21/2020 8:06:06 AM | P | PART |
|
|
attic firewalls; Phone #: ###-####// one side ok,, needs insulation and other side
|
BLD19-01278
| BLD-Blower Door Test Results | 1/16/2020 | 1/17/2020 | 1/17/2020 2:25:01 PM | P | DONE |
|
|
Todd Phone #: ###-####/// 4.3
|
BLD19-04709
| BLD-Framing/Rough-in | 1/17/2020 | 1/17/2020 | 1/17/2020 2:24:43 PM | P | PASS |
|
|
Steve Phone #: ###-####// no electrical
|
BLD19-04868
| BLD-Final | 1/17/2020 | 1/17/2020 | 1/17/2020 2:24:13 PM | P | PASS |
|
|
Walter Phone #: ###-####
|
BLD19-04868
| DOC - Permit Finaled | 1/17/2020 | 1/17/2020 | 1/17/2020 2:24:03 PM | P | PASS |
|
|
|
BLD18-03971
| BLD-Final | 1/17/2020 | 1/17/2020 | 1/17/2020 2:23:11 PM | P | NR |
|
|
Please call with an estimated ETA for inspection, I''d like to be there. Phone #: ###-#### Inspection requested via web by Stephen Griswold// needs hillside,, trades,, hand rails per code,, blower door test,, fire caulking,, address, etc
|
BLD19-04647
| BLD-Energy code compliance | 1/17/2020 | 1/17/2020 | 1/17/2020 2:21:42 PM | P | PASS |
|
|
|
BLD19-03085
| BLD-Framing/Rough-in | 1/17/2020 | 1/17/2020 | 1/17/2020 2:21:13 PM | P | PART |
|
|
Larry Phone #: ###-####,, ok to insulate after doing fixes in the basement areas,, ok to cover upstairs,, upstairs insulation ok
|
BLD19-04868
| DOC - Permit Finaled | 1/17/2020 | 1/17/2020 | 1/17/2020 2:19:54 PM | P | PASS |
|
|
|
MIS19-00389
| BLD-Conference | 1/17/2020 | 1/17/2020 | 1/17/2020 12:31:44 PM | A | PEND |
|
|
Need permits for siding and windows.// talked with Rick,, said he cant do the work at this time due to cost.. said job will sit as is
|
BLD19-01976
| BLD-Final | 1/16/2020 | 1/17/2020 | 1/17/2020 12:06:30 PM | A | NR |
|
|
Noah Phone #: ###-####// needs plans,, smoke/carbon etc.
|
BLD19-04878
| BLD-Framing/Rough-in | 1/16/2020 | 1/17/2020 | 1/17/2020 11:20:28 AM | A | NR |
|
|
Please call when you’re on your way Phone #: ###-#### Inspection requested via web by Mak Hess// walk through only,, needs another ele. and plumbing inspection
|
BLD19-01857
| BLD-Final | 1/16/2020 | 1/17/2020 | 1/17/2020 11:04:32 AM | A | PASS |
|
|
Craig Phone #: ###-####
|
BLD19-01857
| DOC - Permit Finaled | 1/17/2020 | 1/17/2020 | 1/17/2020 11:04:24 AM | P | PASS |
|
|
|
BLD19-01857
| BLD-Blower Door Test Results | 1/17/2020 | 1/17/2020 | 1/17/2020 11:04:13 AM | P | DONE |
|
|
Craig Phone #: ###-####//4.2
|
BLD19-03999
| BLD-Footing | 1/13/2020 | 1/17/2020 | 1/17/2020 10:11:12 AM | A | PASS |
|
|
curt Phone #: ###-####
|
BLD19-03097
| BLD-Footing | 1/16/2020 | 1/17/2020 | 1/17/2020 8:57:11 AM | A | PASS |
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|