BLD99-02641
| BLD-Framing/Rough-in | 1/14/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/14/2000 at 13:19:22. Contact: ###-####. Ok to insulate finish truss engineering & shear nailing. 1/18/00 1:31:28 PM
|
BLD99-00795
| BLD-Energy code compliance | 1/14/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | A | PART |
|
|
gary ###-#### energy code insp 1hr. protection of stair wells required- same as lid assembly. 1/18/00 1:31:56 PM
|
BLD99-00810
| BLD-Framing/Rough-in | 1/14/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | A | PASS |
|
|
VAL ###-####
|
BLD99-00810
| BLD-Energy code compliance | 1/14/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | A | PASS |
|
|
|
BLD99-02734
| BLD-Framing/Rough-in | 1/14/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | A | PART |
|
|
UPSTAIRS FOR COVER\###-#### Ok to insulate- need mechanical insp. 1/19/00 1:34:35 PM
|
BLD00-00031
| BLD-Framing/Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | PASS |
|
|
###-#### bob
|
BLD99-03427
| BLD-Framing/Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC99-03616
| Final | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | FAIL |
|
|
###-#### No access. 1/19/00 1:35:42 PM
|
BLD99-00270
| BLD-Framing/Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | FAIL |
|
|
BOB--- ###-#### RE-INSP FR Insulating- w/blown in- unable to access. Recall w/insulation inspection 1/19/00. 1/19/00 1:35:29 PM
|
MEC00-00123
| Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 10:19:06. Contact: ###-####.
|
MEC00-00123
| Pressure Test | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 10:19:44. Contact: ###-####.
|