ELE00-00148
| Temporary Service | 1/14/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | A | PASS |
|
|
temp ser-- dan ###-#### Temp. pole. 1/18/00 1:26:14 PM
|
ELE00-00153
| Final | 1/17/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/17/2000 at 07:40:08. Contact: ###-####. Street light @ N. 27th & Dewey st. 1/18/00 1:25:19 PM
|
ELE99-03987
| Electrical Rough-In | 1/17/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 01/17/2000 at 10:58:16. Contact: ###-####. Inspection request should be for final inspection. 1/18/00 1:26:03 PM
|
ELE99-03987
| Final | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | A | PASS |
|
|
Completion (tenant).
|
ELE00-00033
| Rough-In Permanent Service | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 07:21:02. Contact: ###-####. Ele. R/I; perm./svc. 1/19/00 10:52:42 AM
|
ELE99-01886
| Electrical Rough-In | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | FAIL |
|
|
for ser--###-####--roger NEC: emt. conduit shall be supported within 3 ft. of panel. 1/19/00 11:12:08 AM
|
ELE99-03888
| Electrical Rough-In | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 08:12:38. Contact: ###-####. Butcher-block wall Ele. R/I; 2-walls. 1/19/00 11:11:32 AM
|
ELE00-00028
| Electrical Rough-In | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | PART |
|
|
PANEL WALL INSP- BERNICE-- ###-#### Ele. R/I- raceways to service panel. 1/19/00 11:12:26 AM
|
ELE99-03064
| Electrical Rough-In | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | PART |
|
|
FOR CONF--- STEVE ###-#### Main switch-gear (conference). 1/19/00 11:11:47 AM
|
ELE99-04601
| Electrical Rough-In | 1/18/2000 | 1/18/2000 | 1/18/2000 12:00:00 AM | P | PASS |
|
|
###-#### 2-upstairs apartment units; Ele. repairs, maintenance. 1/19/00 11:11:14 AM
|