BLD00-02774
| BLD-Final | 1/17/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | A | FAIL |
|
|
###-#### need closer on 1 hr door at boiller rm. fire stop pipe and conduit at wall penatrations. 1/18/2001 10:19:37 AM
|
BLD01-00025
| BLD-Footing | 1/17/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | A | PART |
|
|
ft insp jake -###-####
|
MEC01-00190
| Final | 1/17/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 16:12:19. Contact: ###-####.no access. called contractor. 1/18/2001 10:42:21 AM
|
BLD00-01261
| BLD-Framing/Rough-in | 1/18/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/18/2001 at 07:16:10. Contact: ###-####. 1# df 4 x 12 beam material on site to instal at store front and steel brace to verify assembly at ceilling grid insp. 1/18/2001 9:54:27 AM
|
MEC01-00190
| Final | 1/18/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | A | PASS |
|
|
Todd Hobdey ###-#### gas co. cert. 1/18/2001 2:35:21 PM
|
BLD00-02170
| BLD-Foundation | 1/18/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | P | PART |
|
|
re-bar julio ###-#### placed with special insp. pending report. 1/18/2001 4:14:29 PM
|
BLD99-00821
| BLD-Footing | 1/17/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | P | FAIL |
|
|
FT DAVE- ###-#### ft soil failled at corner of wesa / south peir. archived engineered resubmital and left copy on site. 1/18/2001 3:10:34 PM
|
BLD00-01431
| BLD-Final | 1/17/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | P | NR |
|
|
###-#### or ###-#### danny
|
BLD00-01563
| BLD-Concrete | 1/15/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 07:15:22. Contact: ###-####. placed with special insp. pending report. 1/18/2001 4:14:59 PM
|
BLD00-03070
| BLD-Framing/Rough-in | 1/17/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | P | PART |
|
|
###-#### late pm tennent walls and one bathroom ok.no ele or plm in tenent walls. 1/18/2001 4:13:46 PM
|