ELE01-00191
| Electrical Rough-In | 1/18/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 404 On 1/18/2001 10:05:37 AM
|
ELE00-03097
| Final | 1/18/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 404 On 1/18/2001 10:06:44 AM
|
ELE00-04118
| Final | 1/18/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | P | PASS |
|
|
Alan ###-####
|
ELE01-00100
| Electrical Rough-In | 1/18/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | P | PASS |
|
|
CEILING\\###-####
|
ELE01-00187
| Rough-In Permanent Service | 1/18/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | P | FAIL |
|
|
###-#### not ready 1/18/2001 1:39:56 PM
|
ELE00-04293
| Final | 1/18/2001 | 1/18/2001 | 1/18/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/18/2001 at 09:55:56. Contact: ###-####.
|