PLM05-00073
| Plumbing Rough-in | 1/14/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | A | PASS |
|
|
Called Jim and he will hit for us today 1/14 in the afternoon. THANK YOU! Internet Inspection Request from: Kim Alderson
|
PLM05-00054
| Plumbing Rough-in | 1/14/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | A | PASS |
|
|
Curtis; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
PLM05-00096
| Groundwork | 1/14/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | A | NR |
|
|
|
PLM05-00132
| Water and/or Sewer | 1/18/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 7:12:41 AM. Contact: ###-####.
|
PLM05-00133
| Water and/or Sewer | 1/18/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 7:13:41 AM. Contact: ###-####.
|
PLM05-00079
| Plumbing Rough-in | 1/18/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | A | PASS |
|
|
|
PLM04-03405
| Plumbing Rough-in | 1/18/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 7:50:32 AM. Contact: ###-####.
|
PLM04-03239
| Final | 1/18/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/18/2005 at 7:51:35 AM. Contact: ###-####.
|
PLM05-00142
| Water and/or Sewer | 1/18/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | P | PASS |
|
|
darren ###-####
|
PLM04-02392
| Final | 1/18/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | P | PART |
|
|
TRIM IS COMPLETE EXCEPT FOR CAULKING TOILETS AT THE FLOOR.. CONCRETE FLOORS TO BE STAINED.. STAINING GUY TO CAULK TOILETS.. CAN WE STILL GET FINAL? RENEE; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL double check need,s to be certified seal mop sink at wall and floor limitation for public lav,s to 120 degrees 2003 upc 414.1 contractor to recall when ready 1/18/2005 3:55:42 PM
|
PLM05-00115
| Water and/or Sewer | 1/18/2005 | 1/18/2005 | 1/18/2005 12:00:00 AM | P | PART |
|
|
pauline; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need to pipe T&P relief drain line with approved material ( galvanized, copper, or cpvc piping no part of such piping shall be trapped terminal end shall be pointing downward 1/18/2005 2:06:37 PM
|