Inspections for the day of: Tuesday, January 18, 2005.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC05-00145 Rough-in1/17/20051/18/20051/18/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/17/2005 at 8:58:28 AM. Contact: ###-####.
MEC05-00145 Pressure Test1/17/20051/18/20051/18/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 1/17/2005 at 8:58:36 AM. Contact: ###-####.
BLD04-01142 BLD-Final1/17/20051/18/20051/18/2005 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 1/17/2005 at 9:44:50 AM. Contact: ###-####. ok to move into phase one 1/18/2005 10:25:08 AM
MEC04-03247 Final1/17/20051/18/20051/18/2005 12:00:00 AMAPASS
LAURA ZANE; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
BLD03-02187 BLD-Wall cover1/17/20051/18/20051/18/2005 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 1/17/2005 at 1:24:06 PM. Contact: ###-####. fire dampers in 2 hr wall ok to cover 1/18/2005 10:24:39 AM
BLD04-00079 BLD-Conference1/17/20051/18/20051/18/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 1/17/2005 at 3:20:16 PM. Contact: ###-####.elevator shaft problems arct will reveiw and submit drawnings 1/18/2005 2:38:50 PM
BLD04-01817 BLD-Final1/18/20051/18/20051/18/2005 12:00:00 AMPFAIL
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs elec final on inspection done talked with bob he will reschedule 1/18/2005 4:05:00 PM
BLD04-02671 BLD-Framing/Rough-in1/18/20051/18/20051/18/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 1/18/2005 at 9:10:40 AM. Contact: ###-####. ok to start covering bath room and stair incloser walls 1/18/2005 4:05:43 PM
BLD04-01323 BLD-Concrete1/18/20051/18/20051/18/2005 12:00:00 AMPDONE
Grout CMU wall. - 5' lift, Final lift at Foster building Internet Inspection Request from: Alex Monge
BLD04-01142 BLD-Conference1/18/20051/18/20051/18/2005 12:00:00 AMPDONE
Scheduled by a contractor via Hello! on 1/17/2005 at 9:44:50 AM. Contact: ###-####.
BLD04-02282 BLD-Final1/18/20051/18/20051/18/2005 12:00:00 AMPPASS
justin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD04-02283 BLD-Final1/18/20051/18/20051/18/2005 12:00:00 AMPFAIL
justin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD04-01093 BLD-Final1/18/20051/18/20051/18/2005 12:00:00 AMPCANC
MIS05-00009 BLD-Conference1/14/20051/18/20051/18/2005 12:00:00 AMPPASS
report of substandard housing kenny wise at ###-#### call 1st please shower has black water backing up init called lee rice he will call kenny 1/18/2005 2:35:29 PM