Inspections for the day of: Thursday, January 18, 2007.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-00183 Final1/18/20071/18/20071/18/2007 4:00:51 PMPPASS
WE HAVE COMPLETED THE INSTALLATION OF THE ELECTRICAL WORK. THE TRUCK WASH IS LOCATED IN CENTER OF THE YARD ATTACHED TO THE EXISTING WINDOW BUILDING. AND QUESTIONS PLEASE CONTACT DOUG AT ###-#### Phone #: ###-#### x0000
ok card signed
ELE07-00183 Electrical Rough-In1/18/20071/18/20071/18/2007 4:00:23 PMPPASS
WE HAVE COMPLETED THE INSTALLATION OF THE ELECTRICAL WORK. THE TRUCK WASH IS LOCATED IN CENTER OF THE YARD ATTACHED TO THE EXISTING WINDOW BUILDING. AND QUESTIONS PLEASE CONTACT DOUG AT ###-#### Phone #: ###-#### x0000
ELE06-02800 Permanent Service1/18/20071/18/20071/18/2007 3:28:42 PMPPASS
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--call 1st for access p/s u/g new ok
ELE06-03513 Final1/17/20071/18/20071/18/2007 2:55:00 PMPPART
Phone #: ###-#### corr. posted 300.10&12 34.46 shall provide 4 locknuts at rigid nipple and bushing roof top units, 410.15(B) and 250.122 shall grd poles at hand holes, and needs #10 equip grds
temp occupancy ok card signed
ELE06-04279 Final1/18/20071/18/20071/18/2007 1:30:33 PMPPASS
MICHAEL; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok
ELE06-00422 Final1/16/20071/18/20071/18/2007 1:26:50 PMPCANC
any questions please Bud Horsley Phone #: ###-#### x0000 Inspection cancelled from web by: Sandee Johnson
ELE06-03647 Final1/18/20071/18/20071/18/2007 1:12:30 PMPFAIL
Scheduled by a contractor via Hello! on 1/18/2007 at 8:02:38 AM. Contact: ###-####. corr. fee due called 210.52(A&B)
shall install outlet liv rm stub wall, also install outlet on SABC din. rm side of stub wall, 408.4 circuit directory shall be specific, 406.4(A B C) recepts loose in boxes, 250.122 shall not reduce size of conductors at 120V dryer recept, BCC note complete all trim, also stub wall was added after r/i inspection was done
ELE06-03350 Final1/16/20071/18/20071/18/2007 10:39:31 AMANR
On site journeyman - Randy ###-####. Plz call if problems Phone #: ###-#### met with contr.
ELE06-04433 Electrical Rough-In1/17/20071/18/20071/18/2007 10:24:27 AMAPART
Contact Jason Martineau. Phone #: ###-#### ok anop
ELE07-00046 Electrical Rough-In1/17/20071/18/20071/18/2007 9:56:20 AMAPART
This will be for underground on the NE corner only. Contact name Noah Phone #: ###-#### ok
ELE06-00810 Final1/18/20071/18/20071/18/2007 9:35:50 AMAPASS
Phone #: ###-#### ok
ELE06-04435 Final1/17/20071/18/20071/18/2007 8:58:48 AMAPASS
Phone #: ###-#### ok card signed
ELE07-00151 Final1/18/20071/18/20071/18/2007 8:33:28 AMAPART
t/o for operating rm fixtures ok card signed