Inspections for the day of: Friday, January 18, 2008.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-03605 Final1/18/20081/18/20081/18/2008 4:15:26 PMPPASS
Phone #: ###-#### (P.J.), please call 15 minutes prior Internet Inspection Request from: HARVEY REYNA
ELE07-02897 Final1/17/20081/18/20081/18/2008 3:36:49 PMPPART
Contact:Todd Stewart Phone #: ###-#### Internet Inspection Request from: HARVEY REYNA
checked all receps and roof ok
wiremosd was not finished so we have to check those outlets and 1 floor box by front door that is fed from the wiremold.
water bonding not finished show window outlets not installed
ELE08-00094 Permanent Service1/17/20081/18/20081/18/2008 1:56:37 PMPPASS
bob - please call in the morning to set time to coincide with idaho power Phone #: ###-####
P/S O/H R Ok
ELE07-04071 Final1/18/20081/18/20081/18/2008 1:16:20 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson
ELE07-01163 Final1/17/20081/18/20081/18/2008 10:15:51 AMAFAIL
Call Scott with questions. Phone #: ###-#### Internet Inspection Request from: Vicki Moore
Working clearance required in front of panel
closet fixture to be totally inclosed
ELE07-01161 Final1/17/20081/18/20081/18/2008 10:14:44 AMAFAIL
Call Scott with questions. Phone #: ###-#### Internet Inspection Request from: Vicki Moore
Recep required within 3 ft of sink in master bath.
disconnect or lockout required for water heater.
GFCI protect kitchen counter recep.
finish installing drapery controls and motors.
ELE07-01160 Final1/17/20081/18/20081/18/2008 10:07:40 AMAFAIL
Call Scott with questions Phone #: ###-#### Internet Inspection Request from: Vicki Moore
Working clearance required in front of panel
ELE07-01152 Final1/17/20081/18/20081/18/2008 10:05:52 AMAFAIL
Call Scott with questions Phone #: ###-#### Internet Inspection Request from: Vicki Moore
Working clearance required in front of panel