BLD16-01291
| FIRE-Final Inspection | 1/17/2017 | 1/18/2017 | 1/18/2017 2:56:57 PM | A | PART |
|
|
A temporary for life safety is being given until the Opticon for the main gate is verified by the Boise Fire Dept as functional. I let the contractor know that the gate is not to be used until it is functional. I spoke to the gate installer and the Opticon should be installed by tomorrow morning and tested in the afternoon.
|
FIR16-00640
| INSP-Final Inspection | 1/18/2017 | 1/18/2017 | 1/18/2017 2:53:51 PM | P | PASS |
|
|
permit finaled
|
FIR16-00646
| INSP-Final Inspection | 1/17/2017 | 1/18/2017 | 1/18/2017 2:51:43 PM | P | PASS |
|
|
permit finaled
|
FIR16-00588
| INSP-Sprinkler Rough-in | 1/17/2017 | 1/18/2017 | 1/18/2017 2:16:33 PM | A | PART |
|
|
First floor general rough-in passed with a couple of exceptions which include two additional 90's in both 4" mains close to the riser, missing seismic restraints in the Apparatus Bay and possible required coverage below the brass pole, missing seismic bracing and possible blocked heads in restrooms. The second floor rough-in could not be performed due to pipe routing changes. Plans need to be resubmitted for plan modifications. Additional cover inspections will be required when the sprinkler drops have been cut and located.
|
BLD16-01383
| FIRE-Final Inspection | 1/17/2017 | 1/18/2017 | 1/18/2017 2:12:53 PM | A | PASS |
|
|
life safety passed
|
BLD16-03518
| FIRE-Final Inspection | 1/18/2017 | 1/18/2017 | 1/18/2017 12:32:39 PM | P | PASS |
|
|
Life safety passed
|
BLD15-01393
| FIRE-Final Inspection | 1/18/2017 | 1/18/2017 | 1/18/2017 12:32:13 PM | P | PASS |
|
|
Life safety passed
|
BLD15-01068
| FIRE-Final Inspection | 1/18/2017 | 1/18/2017 | 1/18/2017 12:31:29 PM | P | CANC |
|
|
Rescheduled for tomorrow morning. Need the two FIR permits called in for inspection prior to a life safety inspection
|
FIR16-00644
| INSP-Sprinkler Rough-in/Hydro | 1/17/2017 | 1/18/2017 | 1/18/2017 11:32:39 AM | A | PASS |
|
|
Overhead hydro for the under mezzanine piping passed. Previous corrections done except for the seismic bracing in the corridor.
|
FIR16-00746
| INSP-Final Inspection | 1/18/2017 | 1/18/2017 | 1/18/2017 10:20:11 AM | P | CANC |
|
|
As late as possible Phone #: 2089411846 >> Inspection requested via mobile web by 4:45 to 5:00 pm Inspection cancelled via mobile web on Wednesday, January 18, 2017.
|
BLD16-04198
| FIRE-Conference | 1/17/2017 | 1/18/2017 | 1/18/2017 8:53:01 AM | A | DONE |
|
|
Larry and I went over emergency light placement. I added several in conference rooms.
|
FIR16-00337
| INSP-Final Inspection | 1/17/2017 | 1/18/2017 | 1/18/2017 8:52:22 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00704
| INSP-Final Inspection | 1/17/2017 | 1/18/2017 | 1/17/2017 2:46:08 PM | P | PASS |
|
|
Permit finaled
|