Inspections for the day of: Wednesday, January 18, 2017.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-01291 FIRE-Final Inspection1/17/20171/18/20171/18/2017 2:56:57 PMAPART
A temporary for life safety is being given until the Opticon for the main gate is verified by the Boise Fire Dept as functional. I let the contractor know that the gate is not to be used until it is functional. I spoke to the gate installer and the Opticon should be installed by tomorrow morning and tested in the afternoon.
FIR16-00640 INSP-Final Inspection1/18/20171/18/20171/18/2017 2:53:51 PMPPASS
permit finaled
FIR16-00646 INSP-Final Inspection1/17/20171/18/20171/18/2017 2:51:43 PMPPASS
permit finaled
FIR16-00588 INSP-Sprinkler Rough-in1/17/20171/18/20171/18/2017 2:16:33 PMAPART
First floor general rough-in passed with a couple of exceptions which include two additional 90's in both 4" mains close to the riser, missing seismic restraints in the Apparatus Bay and possible required coverage below the brass pole, missing seismic bracing and possible blocked heads in restrooms. The second floor rough-in could not be performed due to pipe routing changes. Plans need to be resubmitted for plan modifications. Additional cover inspections will be required when the sprinkler drops have been cut and located.
BLD16-01383 FIRE-Final Inspection1/17/20171/18/20171/18/2017 2:12:53 PMAPASS
life safety passed
BLD16-03518 FIRE-Final Inspection1/18/20171/18/20171/18/2017 12:32:39 PMPPASS
Life safety passed
BLD15-01393 FIRE-Final Inspection1/18/20171/18/20171/18/2017 12:32:13 PMPPASS
Life safety passed
BLD15-01068 FIRE-Final Inspection1/18/20171/18/20171/18/2017 12:31:29 PMPCANC
Rescheduled for tomorrow morning. Need the two FIR permits called in for inspection prior to a life safety inspection
FIR16-00644 INSP-Sprinkler Rough-in/Hydro1/17/20171/18/20171/18/2017 11:32:39 AMAPASS
Overhead hydro for the under mezzanine piping passed. Previous corrections done except for the seismic bracing in the corridor.
FIR16-00746 INSP-Final Inspection1/18/20171/18/20171/18/2017 10:20:11 AMPCANC
As late as possible Phone #: 2089411846 >> Inspection requested via mobile web by 4:45 to 5:00 pm Inspection cancelled via mobile web on Wednesday, January 18, 2017.
BLD16-04198 FIRE-Conference1/17/20171/18/20171/18/2017 8:53:01 AMADONE
Larry and I went over emergency light placement. I added several in conference rooms.
FIR16-00337 INSP-Final Inspection1/17/20171/18/20171/18/2017 8:52:22 AMAPASS
Permit finaled
FIR16-00704 INSP-Final Inspection1/17/20171/18/20171/17/2017 2:46:08 PMPPASS
Permit finaled