Inspections for the day of: Thursday, January 18, 2018.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00773 INSP-Sprinkler Rough-in1/18/20181/18/20181/18/2018 3:38:09 PMPPART
Rough-in passed. Piping can be covered. I noted that at the south end of the new coolers it appears the pendant heads will be overspaced off of the cooler walls. I also noted pendant heads overspaced out side of the scope of work near the south end of the tenant space.
FIR17-00453 INSP-Sprinkler Rough-in1/18/20181/18/20181/18/2018 2:46:52 PMPPART
Rough-in passed but the tenting inspection failed. Piping can not be covered.
FIR17-00522 INSP-Sprinkler Rough-in1/18/20181/18/20181/18/2018 1:46:21 PMPPART
The rough-in and tenting has passed for the fourth floor piping guest rooms from column line 10 to the west end of the building. This piping can be covered.
BLD17-04320 FIRE-Final Inspection1/17/20181/18/20181/18/2018 1:44:34 PMPFAIL
No city approved plans or notes on site. I also noted the project related fire sprinkler permit has not been finaled

Jeremy Phone #: ###-####
BLD17-04081 FIRE-Final Inspection1/18/20181/18/20181/18/2018 11:53:37 AMPPASS
Life safety passed

Jeff Phone #: ###-####
FIR17-00739 INSP-Sprinkler Rough-in1/17/20181/18/20181/18/2018 11:52:15 AMAPART
Rough-in for the most part is ok. Tim approved the 1/2" heads being used. Will need sprinkler coverage under both stairs since the areas are being used for storage. Also possibly need coverage under the coveyor since it is also being used for storage. A hydro test wil also be needed as discussed.

Nate Phone #: ###-####
BLD17-02618 FIRE-Final Inspection1/17/20181/18/20181/18/2018 11:12:05 AMAPASS
Life safety passed

Dwayn Phone #: ###-####
FIR17-00422 INSP-Supply line flush1/17/20181/18/20181/18/2018 10:41:36 AMAPASS
Both underground supply line flushes passed
FIR17-00422 INSP-Sprinkler Rough-in/Hydro1/17/20181/18/20181/18/2018 10:41:07 AMAPASS
The underground hydro test for both underground supply lines passed
BLD17-04503 FIRE-Final Inspection1/17/20181/18/20181/18/2018 10:40:18 AMAPASS
Life safety passed

Call ahead to meet // Chris Phone #: ###-####
BLD15-01119 FIRE-Final Inspection1/17/20181/18/20181/18/2018 8:50:24 AMACANC
Ed Phone #: ###-####
BLD16-01590 FIRE-Final Inspection1/17/20181/18/20181/18/2018 8:50:13 AMACANC
Ed Phone #: ###-####
BLD16-01594 FIRE-Final Inspection1/17/20181/18/20181/18/2018 8:50:05 AMACANC
Ed Phone #: ###-####
BLD16-01592 FIRE-Final Inspection1/17/20181/18/20181/18/2018 8:49:56 AMACANC
Ed Phone #: ###-####
BLD15-01120 FIRE-Final Inspection1/17/20181/18/20181/18/2018 8:49:42 AMACANC
Ed Phone #: ###-####
BLD16-01591 FIRE-Final Inspection1/17/20181/18/20181/18/2018 8:49:32 AMACANC
Ed Phone #: ###-####
BLD16-01593 FIRE-Final Inspection1/17/20181/18/20181/18/2018 8:49:22 AMACANC
Ed Phone #: ###-####
BLD16-01595 FIRE-Final Inspection1/17/20181/18/20181/18/2018 8:49:10 AMACANC
Ed Phone #: ###-####
FIR17-00173 INSP-Final Inspection1/16/20181/18/20181/17/2018 7:46:38 PMACANC
Probably won’t be ready until 10:00 am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball