FIR17-00773
| INSP-Sprinkler Rough-in | 1/18/2018 | 1/18/2018 | 1/18/2018 3:38:09 PM | P | PART |
|
|
Rough-in passed. Piping can be covered. I noted that at the south end of the new coolers it appears the pendant heads will be overspaced off of the cooler walls. I also noted pendant heads overspaced out side of the scope of work near the south end of the tenant space.
|
FIR17-00453
| INSP-Sprinkler Rough-in | 1/18/2018 | 1/18/2018 | 1/18/2018 2:46:52 PM | P | PART |
|
|
Rough-in passed but the tenting inspection failed. Piping can not be covered.
|
FIR17-00522
| INSP-Sprinkler Rough-in | 1/18/2018 | 1/18/2018 | 1/18/2018 1:46:21 PM | P | PART |
|
|
The rough-in and tenting has passed for the fourth floor piping guest rooms from column line 10 to the west end of the building. This piping can be covered.
|
BLD17-04320
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 1:44:34 PM | P | FAIL |
|
|
No city approved plans or notes on site. I also noted the project related fire sprinkler permit has not been finaled
Jeremy Phone #: ###-####
|
BLD17-04081
| FIRE-Final Inspection | 1/18/2018 | 1/18/2018 | 1/18/2018 11:53:37 AM | P | PASS |
|
|
Life safety passed
Jeff Phone #: ###-####
|
FIR17-00739
| INSP-Sprinkler Rough-in | 1/17/2018 | 1/18/2018 | 1/18/2018 11:52:15 AM | A | PART |
|
|
Rough-in for the most part is ok. Tim approved the 1/2" heads being used. Will need sprinkler coverage under both stairs since the areas are being used for storage. Also possibly need coverage under the coveyor since it is also being used for storage. A hydro test wil also be needed as discussed.
Nate Phone #: ###-####
|
BLD17-02618
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 11:12:05 AM | A | PASS |
|
|
Life safety passed
Dwayn Phone #: ###-####
|
FIR17-00422
| INSP-Supply line flush | 1/17/2018 | 1/18/2018 | 1/18/2018 10:41:36 AM | A | PASS |
|
|
Both underground supply line flushes passed
|
FIR17-00422
| INSP-Sprinkler Rough-in/Hydro | 1/17/2018 | 1/18/2018 | 1/18/2018 10:41:07 AM | A | PASS |
|
|
The underground hydro test for both underground supply lines passed
|
BLD17-04503
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 10:40:18 AM | A | PASS |
|
|
Life safety passed
Call ahead to meet // Chris Phone #: ###-####
|
BLD15-01119
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 8:50:24 AM | A | CANC |
|
|
Ed Phone #: ###-####
|
BLD16-01590
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 8:50:13 AM | A | CANC |
|
|
Ed Phone #: ###-####
|
BLD16-01594
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 8:50:05 AM | A | CANC |
|
|
Ed Phone #: ###-####
|
BLD16-01592
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 8:49:56 AM | A | CANC |
|
|
Ed Phone #: ###-####
|
BLD15-01120
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 8:49:42 AM | A | CANC |
|
|
Ed Phone #: ###-####
|
BLD16-01591
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 8:49:32 AM | A | CANC |
|
|
Ed Phone #: ###-####
|
BLD16-01593
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 8:49:22 AM | A | CANC |
|
|
Ed Phone #: ###-####
|
BLD16-01595
| FIRE-Final Inspection | 1/17/2018 | 1/18/2018 | 1/18/2018 8:49:10 AM | A | CANC |
|
|
Ed Phone #: ###-####
|
FIR17-00173
| INSP-Final Inspection | 1/16/2018 | 1/18/2018 | 1/17/2018 7:46:38 PM | A | CANC |
|
|
Probably won’t be ready until 10:00 am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|