BLD99-01076
| BLD-Foundation | 1/18/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 13:22:15. Contact: ###-####. Masonry-bar in place- ok to grout. 1/19/00 1:40:53 PM
|
BLD99-02714
| BLD-Final | 1/18/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | A | FAIL |
|
|
rob-- ###-#### fn occ Recall. 1/19/00 1:39:49 PM
|
BLD00-00002
| BLD-Footing | 1/18/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | A | PART |
|
|
dan-- ###-#### ft insp Ftg. 1/19/00 1:39:39 PM
|
BLD99-03379
| BLD-Other | 1/18/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 15:58:27. Contact: ###-####. C/N firestops. 1/19/00 1:40:22 PM
|
BLD99-02513
| BLD-Final | 1/18/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | A | FAIL |
|
|
sid ###-#### C/N; clearance @ corridor door (12" min). 1/19/00 1:40:12 PM
|
BLD99-03121
| BLD-Framing/Rough-in | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | A | PASS |
|
|
Check interior shear @ energy.
|
BLD99-02585
| BLD-Framing/Rough-in | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | A | PART |
|
|
"Shear Insp." nailing ok; C/N: need eng's ok for blocking attachment @ drag strut & extend hold downs.
|
BLD99-02806
| BLD-Conference | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | A | PASS |
|
|
W/Tim, supt. re: handrail- ok non-continuous @ landing.
|
BLD99-01410
| BLD-Framing/Rough-in | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | P | FAIL |
|
|
C/N- shaft, handrail, etc.- ok to place ceiling tiles.
|
BLD99-00682
| BLD-Conference | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | P | PASS |
|
|
BKH's; Rec'd submittal for ceiling (rated) extension @ corridor. ok.
|
BLD99-03349
| BLD-Energy code compliance | 1/17/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/17/2000 at 13:56:35. Contact: ###-####. Keep C/N; need further info re vault hip roof. 1/20/00 8:57:35 AM
|
BLD00-00093
| BLD-Footing | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | P | PART |
|
|
###-#### Ftg. 1/20/00 8:57:44 AM
|
BLD99-03477
| BLD-Framing/Rough-in | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | P | PASS |
|
|
###-#### John Hardy after 3pm Prev. done by 316? 1/20/00 8:57:11 AM
|
BLD99-01368
| BLD-Conference | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | P | PASS |
|
|
andy-- ###-#### conf-- W/arch. need all ok's for final. 1/20/00 8:58:32 AM
|
BLD99-03509
| BLD-Footing | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | P | PASS |
|
|
BRuce###-#### Ftg. ok. 1/20/00 8:57:56 AM
|
BLD99-02745
| BLD-Footing | 1/19/2000 | 1/19/2000 | 1/19/2000 12:00:00 AM | P | PART |
|
|
###-#### Jerry Estep Ext. ftg. @ rear add'n.. no rebar noted on plans. 1/20/00 8:56:56 AM
|