BLD00-03097
| BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | A | PART |
|
|
jim-- ###-#### re-insp fr
ok to insulate, c/n posted on re-doing part of plan on shear/holddowns 1/19/2001 11:33:13 AM
|
BLD00-03324
| BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | A | PART |
|
|
###-####
ok to cover new bath room 1/19/2001 11:46:40 AM
|
BLD00-02612
| BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | A | PART |
|
|
###-####
c/n posted, trusses, shear nailing/// ok to rock unaffected areas 1/19/2001 10:33:31 AM
|
BLD00-03635
| BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | A | PART |
|
|
###-####
ok to cover basement, upper floor, part of main after verbal corrections 1/19/2001 12:36:43 PM
|
BLD01-00023
| BLD-Footing | 1/18/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | A | CANC |
|
|
Daniel ###-####
|
BLD00-03617
| BLD-Footing | 1/19/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 07:10:16. Contact: ###-####.
|
BLD00-03619
| BLD-Footing | 1/19/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 07:12:11. Contact: ###-####.
|
BLD00-03615
| BLD-Footing | 1/19/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 07:12:43. Contact: ###-####.
|
BLD00-03348
| BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | P | PART |
|
|
Dave ###-####
ok for ceiling grid on 1st phase, verify the rest of wall bracing @ final 1/19/2001 2:17:51 PM
|
BLD00-03397
| BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | P | PART |
|
|
CONF AND SHEAR ###-####
shear ok 1/19/2001 3:17:07 PM
|
BLD00-02188
| BLD-Final | 1/18/2001 | 1/19/2001 | 1/19/2001 12:00:00 AM | P | CANC |
|
|
Gary ###-#### please call before you go out so that he can meet you over there...
|