Inspections for the day of: Friday, January 19, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03097 BLD-Framing/Rough-in1/18/20011/19/20011/19/2001 12:00:00 AMAPART
jim-- ###-#### re-insp fr
ok to insulate, c/n posted on re-doing part of plan on shear/holddowns 1/19/2001 11:33:13 AM
BLD00-03324 BLD-Framing/Rough-in1/18/20011/19/20011/19/2001 12:00:00 AMAPART
###-####
ok to cover new bath room 1/19/2001 11:46:40 AM
BLD00-02612 BLD-Framing/Rough-in1/18/20011/19/20011/19/2001 12:00:00 AMAPART
###-####
c/n posted, trusses, shear nailing/// ok to rock unaffected areas 1/19/2001 10:33:31 AM
BLD00-03635 BLD-Framing/Rough-in1/18/20011/19/20011/19/2001 12:00:00 AMAPART
###-####
ok to cover basement, upper floor, part of main after verbal corrections 1/19/2001 12:36:43 PM
BLD01-00023 BLD-Footing1/18/20011/19/20011/19/2001 12:00:00 AMACANC
Daniel ###-####
BLD00-03617 BLD-Footing1/19/20011/19/20011/19/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 01/19/2001 at 07:10:16. Contact: ###-####.
BLD00-03619 BLD-Footing1/19/20011/19/20011/19/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 01/19/2001 at 07:12:11. Contact: ###-####.
BLD00-03615 BLD-Footing1/19/20011/19/20011/19/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 01/19/2001 at 07:12:43. Contact: ###-####.
BLD00-03348 BLD-Framing/Rough-in1/18/20011/19/20011/19/2001 12:00:00 AMPPART
Dave ###-####
ok for ceiling grid on 1st phase, verify the rest of wall bracing @ final 1/19/2001 2:17:51 PM
BLD00-03397 BLD-Framing/Rough-in1/18/20011/19/20011/19/2001 12:00:00 AMPPART
CONF AND SHEAR ###-####
shear ok 1/19/2001 3:17:07 PM
BLD00-02188 BLD-Final1/18/20011/19/20011/19/2001 12:00:00 AMPCANC
Gary ###-#### please call before you go out so that he can meet you over there...