Inspections for the day of: Friday, January 19, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00013 BLD-Foundation1/18/20011/19/20011/19/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/18/2001 at 14:10:49. Contact: ###-####. Rebar ok, hd not installed at time of inspections. 1/19/2001 10:02:44 AM
BLD01-00112 BLD-Footing1/18/20011/19/20011/19/2001 12:00:00 AMAPART
###-####: Reviewed hd and rebar requirements according to Boise City Wall Bracing Requirement. 1/19/2001 9:28:13 AM
BLD99-03673 BLD-Wall cover1/18/20011/19/20011/19/2001 12:00:00 AMAPASS
MEC00-03382 Final1/18/20011/19/20011/19/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/18/2001 at 15:35:38. Contact: ###-####.
BLD00-03638 BLD-Wall cover1/18/20011/19/20011/19/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/18/2001 at 15:45:40. Contact: ###-####. c/n issued, hd ok-need to finish nailing per plans (areas marked with black). 1/19/2001 10:56:25 AM
BLD00-03198 BLD-Framing/Rough-in1/18/20011/19/20011/19/2001 12:00:00 AMAFAIL
reinspection ###-#### travis or kelly Prior correction notices item are not completed. Mechanical r.i. needed, eng, or manufacture repair for cut PRI. 1/19/2001 9:52:51 AM
BLD00-02727 BLD-Final1/18/20011/19/20011/19/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/18/2001 at 16:55:27. Contact: ###-####.Cert. of Compliance issued. 1/19/2001 3:04:18 PM
BLD00-03579 BLD-Framing/Rough-in1/19/20011/19/20011/19/2001 12:00:00 AMPNR
shear nailing george ###-#### No approved plans on site 1/19/2001 2:29:58 PM
BLD00-02100 BLD-Energy code compliance1/19/20011/19/20011/19/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 01/19/2001 at 10:16:02. Contact: ###-####. Wrong house, contractor cancelled. 1/19/2001 2:19:22 PM
BLD00-01872 BLD-Energy code compliance1/19/20011/19/20011/19/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/19/2001 at 10:29:26. Contact: ###-####. Additional items required on posted c/n. ok to insulate, not to cover. 1/19/2001 2:46:54 PM
BLD00-03090 BLD-Energy code compliance1/19/20011/19/20011/19/2001 12:00:00 AMPPASS
Added by Inspector: 420 On 1/19/2001 2:20:01 PM
BLD01-00080 BLD-Framing/Rough-in1/18/20011/19/20011/19/2001 12:00:00 AMPPASS
GEORGE ###-#### FR Except plumbing wall, pending plumbing ok. 1/19/2001 2:18:54 PM